Forum quick links
Calculate U-value of exterior wall
NC-v4 EAp2:Minimum energy performanceposted by Michael on
Regarding the U-value of the exterior wall in the proposed model, I see the LEED calculator provided a hint "Proposed construction assembly U-factor should be as-designed and consistent with A
Is Rainwater Cistern acceptable as LID Techniques?
NC-v4.1 SSc4:Rainwater Managementposted by Michael on
Hi LEED experts, I read v4.1 "Further explanation", in the first section "Examples of Acceptable LID techniques", LEED mentioned rainwater cistern.
Does LEED require a third-party to verify the LCA report?
NC-v4.1 MRc1:Building Life-Cycle Impact Reductionposted by Michael on
My project is using One Click software to do LCA report.
Modeling a warehouse that is divided into multiple typical units
CS-v4 EAc2:Optimize energy performanceposted by Michael on
My project is a big dry warehouse, which is divided into 7 typical units for future tenants. There is a small office with AC in each unit.
Option 1 - what is the maximum number of cycles
NC-v4.1 WEc3:Optimize Process Water Useposted by Michael on
The guideline said to maximize the number of cycles by not exceeding the maximum concentration level. However, it's unclear what is the maximum cycle numbers that LEED is looking for.
RECs - projects outside the U.S.
NC-v4 EAc7:Green power and carbon offsetsposted by Camila Rossini on
Could anyone help me verfify if the following understandig is correct? Tks!
Tenant doesn't install water fixtures - can automatically get 1 point for Option 1 - water analysis?
CI-v4 IPc1:Integrative processposted by Michael on
Hi, My project is interior retail, and they don't install any sanitaryware fixtures in tenant scope.
Do we count all car parking lots of the base building in comparison with the Base ratios?
CI-v4.1 LTc5:Reduced Parking Footprintposted by Michael on
Hi LEED experts, for option1, in comparison with the Base Ratios, will we just count car parking lots that are owned and used by the fit-out projects? we won't count the entire&
Natural ventilation: what output from CFD model we need to show LEED for compliances?
NC-v4 EQp1:Minimum indoor air quality performanceposted by Michael on
Hi LEED experts, my project is a warehouse, they use natural ventilation through a double side louver.
Who can supply Potable water analysis results?
NC-v4 WEc3:Cooling tower water useposted by Alex Edwards on
Hello,