Forum quick links
Energy Star Protfolio Manager
EBOM-v4 EAp2:Minimum energy performanceposted by Sarfaraj Khan on
Hi Can international project (UAE) attempting LEED V4 O&M can used Energy Star Protfolio Manager Regards
Monthly Evapotranspiration Rate
NC-v4 WEp1:Outdoor water use reductionposted by Ahmed Labeeb on
Dear,
Pre-selected sites, can a project still opt for Integrative Process credit?
NC-v4 IPc1:Integrative processposted by Nermin Hegazy on
We are studying the feasibility of acheiving LEED certification for a series of floors in an office building.
solar PV Farm adjacent to Datacenter
Data-Centers-NC-v4.1 EAp2:Minimum Energy Performanceposted by S S on
Hello Everyone,
Greetings!
The proposed Datacenter building is intended to achieve LEED certification under LEED v4.1 BD+C Rating system - Datacenter
Energy Model - Alternative compliance for LEED V4.1 BD+C
NC-v4.1 EAc2:Optimize Energy Performanceposted by Amal Venugopal on
Hi All,
LEED ID+C, Retail
Retail-CI-v4 EAc2:Optimize energy performanceposted by Toshif Ruikar on
Hi, My project is a retail shop in a big mall.
Laboratories guidelines mentioned in COMNET
CI-v4 EAp2:Minimum energy performanceposted by SSN Energy Model on
Hello Everyone,
Greetings!...
Flooring under LEED v4 - Less stringent than LEED v3?
NC-v4 EQc2:Low emitting materialsposted by Nandan Tavkar on
For LEED v4, so long as the flooring is tested for TVOC under General Emissions Evaluation (CDPH 1.1), it appears to comply complies. It feels as if flooring under LEED v4 is less stringe
ID+C Retail -- Dishwasher requirements for WEp1
CI-v4 WEp1:Indoor water use reductionposted by BEE Incorporations on
A retail space inside a mall is exploring to purchase a dishwasher. This dishwasher will be used by the limited store employees only twice a day.
LEED v4.1 Energy Cost Budget Method - Clarifications
NC-v4.1 EAp2:Minimum Energy Performanceposted by Amal Venugopal on
Hi All,
Greetings!
Hope you all are safe.