Baseline Pumping Power

NC-2009 EAp2:Minimum Energy Performance
posted by  Ahmed Labeeb  on 

Based on ASHRAE 90.1, the chilled water pumping power must be 22 W/gpm and does not mentioned the effect of pumping head.

1
Thu Feb 9, 2017, 1:06 pm

Shopping mall and Community Connectivity

General forums
posted by  Nadia Azzam  on 

My project is a mall that is planned to serve a district level; it definately includes at least 10 of the basic services listed in Appendix 1.

1
Thu Dec 4, 2014, 9:36 pm

Arc Platform

Performance Period
posted by  Sarfaraj Khan  on 

Hi Did any one know any guideline or book from USGBC to complete the project documents for LEED V4 O&M in the Arc Platform if the project is going for performance pathway

1
Wed Apr 12, 2017, 2:45 pm

LEED CI v3 - Ofice - Energy Model. Please Advise

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  SSN Energy Model  on 

Hi, I am doing Energy Model for LEED CI Project under V3 2009 Rating System. The project is G+M+3 Floors. Our tenant spaces are located in 1st Floor.

6
Wed Aug 23, 2017, 6:08 pm

Leed 2009 NC-District cooling path one

NC-2009 EAc1:Optimize Energy Performance
posted by  Mark JIN  on 

Dear Friends, I have a project located at Dubai where a localized existing district cooling plant will be providing chilled water.

10
Default Avatar
LEEDuser Basic Member
0 thumbs up
Fri Mar 24, 2017, 1:48 pm

Flat land

ND-Plan-v4 SLLc6:Steep slope protection
posted by  Flavia Marques  on 

How about if there is no slope can we achieve the credit by default?

3
Default Avatar
LEED AP
Deerns
LEEDuser Basic Member
0 thumbs up
Thu May 26, 2016, 3:25 pm

Need your Advise - Urgent (Sports Hall Project)

NC-2009 EAp2:Minimum Energy Performance
posted by  SSN Energy Model  on 

Hi, We are doing Energy Simulation for Sports Hall Project (G+1 Story building). Sports hall having single playing court and it will be used for various sports activities.

13
Mon Mar 7, 2016, 8:54 pm

PU Foam Insulation - Emission Test ISO16000-11

NC-v4 EQc2:Low emitting materials
posted by  Jovelyn Lagunday  on 

General emissions requirements as per LEEDV4 - TVOC's result after 14 days but the information available in accordance with ISO1600 method, TVOC testing results after 28 days.

3
Independent consultant on VOC issues
formerly with Eurofins Product Testing A/S
LEEDuser Basic Member
246 thumbs up
Tue Feb 23, 2016, 6:49 pm

Shuttle bus

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Karim Farah  on 

“ The project (a private factory) is seeking to fulfill the credit requirement of the credit SS Credit 4.1 – Alternative Transportation – Public Transportation access) .

2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Tue Jan 5, 2016, 5:13 am

Anchor Bolt Recycle Content

NC-2009 MRc4:Recycled Content
posted by  Sarfaraj Khan  on 

Hi I have a anchor bolt material and the supplier is saying that the steel is the world most recycle material.

2
Default Avatar
LEEDuser Expert
472 thumbs up
Thu Dec 10, 2015, 3:25 pm