Project size extended in the middle of construction

NC-v4 MPR3:Must comply with project size requirements
posted by  wachira sosaeng  on 

My project registered for LEED 2009, mixed use building with 2 towers on the same podium.

1
Tue May 30, 2017, 5:12 pm

100% outdoor air indirec evaporative cooling system

NC-2009 EAp2:Minimum Energy Performance
posted by  BEE Incorporations  on 

Hi everybody, The project is a garment factory. We are modeling a 100% outdoor air IEC system for the proposed case. And the system 8 (VAV with PFP Boxes) is modeled in the baseline case.

1
Mon Dec 28, 2015, 4:08 pm

SHGC Value ASHRAE 90.1-2007

NC-2009 EAp2:Minimum Energy Performance
posted by  John Covello  on 

Hello everyone, Are the maximum SHGC values in ASHRAE 90.1-2007 suggested only? For example on table 5.5-1 there is a max SHGC listed of 0.25.

1
Thu Apr 9, 2015, 2:14 pm

Can I omit the IP credit since it is stand alone?

NC-v4 IPc1:Integrative process
posted by  wachira sosaeng  on 

Generally,in other categories, we have to perform to meet all prerequisites though we don't need any credits in the categories (suppose that we have enough credits that meet our goal.

1
Mon Aug 1, 2016, 3:21 pm

Certify some of multiple fitout floor

CI-2009 MPR2:Must be a complete, permanent building or space
posted by  sompoche sirichote  on 

Our client will rent 8,10-20 floor within 20 stories building. They would like to get LEED CI certify only for 8 and 10 floor. Can it be done under single project certification?

0

Floor joists part of interior?

NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  John Covello  on 

Hello, Are floor joists considered part of the building interior? So artificial wood used in the joists cannot have urea formaldehyde?

1
Fri Dec 11, 2015, 3:41 pm

Preferred Parking both inside and outside LEED boundary

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  sompoche sirichote  on 

Our project is factory expansion and our client purchase a new land nearby for parking facilities. The local zoning require 110 parking lot so we provide 104 parking lots on a new land outside LEED

1
Sat Aug 26, 2017, 9:46 pm

Can I select my building as "Healthcare" in Portfolio Manager?

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Amornchai Challcharoenwattana  on 

My building is a licensed hospital and we are trying to be certified in the category of LEED Existing Building O&M as Healthcare option is not available in LEED V.3.

1
Fri May 13, 2016, 10:02 pm

LEED EBOM EA c.4

EBOM-2009 EAc4:On-Site and Off-Site Renewable Energy
posted by  Fabio Frescia  on 

Hello, I have a LEED EBOM project in Thailand. I am now dealing with EA c.4 - On site or Off site Renewable Energy.

1
Fri Oct 16, 2015, 3:18 pm

Acceptable thermal conditions in naturally conditioned spaces

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  Panupant Phapant  on 

There is a cafeteria where the HVAC designer of record intends to have it naturally conditioned.

0