Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Storm water calculation

CS-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Magda Aghababyan  on 

Hi, We are working in project previously land was empty top soil is hard and when calculating Pre-development

1
Thu Jan 19, 2017, 5:50 pm

Nee of a fire suppression system

NC-2009 EAc4:Enhanced Refrigerant Management
posted by  Magda Aghababyan  on 

Hi all, Currently we are working on a project which does not have a fire suppression system, but is trying to achieve "Enhanced refrigerant management" credit in LEED NC 2009. In the LEED online fo

1
Tue Jun 6, 2017, 1:46 pm

Meeting parking requirements for residential spaces

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  Magda Aghababyan  on 

Dear Sir/ Madam, Our project (Hotel) is in a location where there are no defined local zoning requirements for parking.

1
Fri Nov 27, 2015, 4:43 am

Exterior lighting design

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Sivarajah Ragulakeethan  on 

Hi, We are working on commercial interior projects. While doing the model we didn't receive exterior lighting design.

4
Tue Aug 1, 2017, 3:00 pm

Aerators use in water flow fittings

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Magda Aghababyan  on 

Hi, Currently we are working in a office project. For the aesthetic purposes the project owners has selected flow fittings which does not meet the LEED requirement.

2
Wed Apr 5, 2017, 9:01 am

Water use in a campus project

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Magda Aghababyan  on 

We are working on a LEED campus project which is going to be certified with one new construction building (will be certified LEED NC 2009) and some other buildings which are not going to be certifi

2
Wed Apr 5, 2017, 8:58 am

Interior paint's VOC

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Magda Aghababyan  on 

According to Green Seal Standard GS-11, Paints, 1st Edition, May 20, 1993 the VOC limit for interior flat paint is 50 grams/liter of product minus water.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Mar 13, 2017, 5:04 am

Al Cladding - Testing Requirements

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Keerthi Ratnayake  on 

Hi, Does Al cladding used for interior walls need to be tested or is it qualified for the credit without testing? Thanks

2
Fri Mar 11, 2016, 12:32 am

Power generated in Mini Hydro Power Plant

NC-2009 EAc2:On-Site Renewable Energy
posted by  Keerthi Ratnayake  on 

Hi, We have a mini hydro power plant project. Can we accommodate the total power generated in the plant towards this credit? Thanks!

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Jun 16, 2015, 6:39 pm

Domestic Hot Water System

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Keerthi Ratnayake  on 

Is it a mandatory requirement to install a domestic hot water system in a LEED project?

2
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Thu Feb 26, 2015, 5:11 pm