Forum quick links
Project Name maximum character limit
posted by Manivannan Devaraj on
What is the maximum character limits for Project Name character
7.6.1.2 Extracting Fan Power – Baseline Design
NC-v4 EAc2:Optimize energy performanceposted by Amal Venugopal on
Hi Sir,
Greetings!
The following content is copied from,
Can consider the air cooled chiller yard as central plant
CI-v4 EAp2:Minimum energy performanceposted by SSN Energy Model on
Hi to all,
Greetings!
I am doing Energy Model as per design documents of office space which has target for LEED ID+C Gold v4.
ASHRAE 90.1.2010 Mandatory & Prescriptive Requirements vs Energy Model
CI-v4 EAc2:Optimize energy performanceposted by SSN Energy Model on
Hi to all,
I am doing energy model for one of our LEED CI Project under v4 rating system.
The following contents are copied from reference guide,
VOC Limit for opaque paints for wood.
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Suhas Kurikkal on
We have opaque flat paint to be applied for the decorative MDF panels in our project.
Zero Lot line Plot and Option 2 Scenario
NC-v4 SSc4:Rainwater managementposted by Boobalan Saravanan on
Hi all.
Commissioning Documentation for 7 separate towers sharing a common ground floor & podium level with shared/mixed MEP Systems
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Joshua ADY on
We are working as an independent commissioning authority (ICA) for a LEED V3 registered project with the following configuration;
Primer and Top Coating for Carbon Steel Piping (Sprinkler System)
Healthcare-v2009 IEQc4:Low-emitting materialsposted by Mustafa Kucukaslan on
I am working on a new construction for Healthcare facility as MEP Subcontractor which will apply for LEED Gold.