Forum quick links
PV Solar Panels outside LEED Boundary
NC-2009 EAc2:On-Site Renewable Energyposted by Ammar Yahia on
A New Construction Project in which the PV panels to be installed on a "330,000 SQM roof of an airport terminal building project" to offset 22% of annual energy cost.
Quality Views LEED Calculator - Multiple View Types, Same Space
NC-v4 EQc8:Quality viewsposted by Tahani Khalid on
When finding the area of compliance for a single room under multiple view types, does the regularly occupied space that is entered for that space change?
Water fountains and impact on OUtdor Water Use reduction in LEED v.4
NC-v4 WEc1:Outdoor water use reductionposted by Tim Bell on
Does anyone have any previous experience on the impact of water fountains and features on Outdoor Water Use reduction? Should these be included or not? There does not appear to be any s
Time Based Sensor Flash Valve for Dual Flash
NC-2009 WEc3:Water Use Reductionposted by Orçun Özhelvaci on
We have a project where we can only use Flash Valves for WC instead of Reservoir.
Friendly leed
Healthcare-v4 MPR2:Must use reasonable LEED boundariesposted by AHMED ABDELHAKAM on
I work in leed health care project in Kuwait and our contract state that our project have to be friendly leed ?
-What mean by friendly leed.
Could you confirm the attached cd/m2 results?
NC-v4 EQc6:Interior lightingposted by SSN Energy Model on
Hi,
Greeting!
Any minimum area for Roof after exclusions?
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Orçun Özhelvaci on
Hello,
FAO EToCalc software help
NC-v4 IPc1:Integrative processposted by S. Sachs on
Hello, I'm working on a project in Kuwait and need to achieve the IPc1 credit for water consumption. I've been struggling to use the LEED-recommended ETo calculator tool, produced by the FAO, whi
Reuse of aggregates
EBOM-2009 MRc7:Solid Waste Management—Ongoing Consumablesposted by Fareed Alghimlas on
The building our team is trying to get it LEED certified has originally a shallow swimming pool with stones and aggregates in it for decorative purposes, during the performance period, the buildin
Satisfaction rating
EBOM-2009 IEQc2.1:Occupant Comfort—Occupant Surveyposted by Fareed Alghimlas on
Is it acceptable to resort to a 5 point scale on the comfort survey instead of the 7 point?