Forum quick links
Indoor Water Usage Prerequisite Requirements
CI-v4 WEp1:Indoor water use reductionposted by rakesh bhatia on
In the reference guide of LEED ID+C V4, it is mentioned under prerequisite the newly installed plumbing fixtures must be according to the Table 6 flow rates.
need of two excel file to show daylight compliance ?
NC-v4 EQc7:Daylightposted by Alwin Jino on
As per Version 4.1, IEQ Credit-Daylight: Options 2, Illuminance calculations.
How to draw the 11 degree line to calculate unobstructed view
Healthcare-v2009 IEQc8.2:Daylight and views - viewsposted by P Hariharan on
Hello all, Please can anybody tell how to draw the 11 degree angle line in drawing to calculate the compliant areas for Credit IEQ 8.2.
Evaporative Cooling units
NC-v4 EAp2:Minimum energy performanceposted by sonali rajwade on
We are working on a Manufacturing Building project in India. Direct evaporative cooling units (ECU) are used for cooling in certain spaces like office areas and a manufacturing 
Minimum IAQ performance monitoring requirement
NC-v4 EQp1:Minimum indoor air quality performanceposted by sonali rajwade on
We are having query related to prerequisite requirement of monitoring in LEED BD+C V4.
Sample documents for this credit
CI-v4 EQc5:Thermal comfortposted by nasrin belim on
Hi LEED User
Please if available than share the sample documentation or chart for CIv4-EQc5 Thermal Comfort
thanks
LEED EB v4.1 - Data Centers
EBOM-v4.1 EAp3:Energy Performanceposted by Vanni arasan on
I am working on LEED v4.1 EB O&M Datacenter rating system, I haven't getting Energy Performance score. Please advise how to enter the energy data i.e., Whole Facility Energy Consumption S
Leed ap in innovation credit
NC-v4 INc2:LEED Accredited Professionalposted by Vidya Thota on
Enhanced Commissioning V4
NC-v4 EAc1:Enhanced commissioningposted by Prakash Sekar on
Can u share the sample submittal document for Enhanced Commissioning V4
Modeling Evaporative cooling systems (ambiator)
NC-2009 EAp2:Minimum Energy Performanceposted by Visu Boj on
Hi all, Iam modelling ambiator for a factory building in India. My baseline system is Packaged VAV.