Forum quick links
Changing Facilities
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Sara Johansson on
I am working on a LEED CS v.2009 project greater than 300 000 sf. In the LEED Online form I have to fill out number of changing facilities and number of showers.
Filling the Minimum Performance Calculator for 100% OA
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Rasita Masalskyte on
SIngle 100% outdoor air AHU is serving multiple zones (through diffusers) on couple of floors in a highrise office building.
"Box" within an exisiting Warehouse
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Gina Dederer on
Our particular project consists of a 400sqm 1 floor "Box" (walls and roof) to be built in its entirety inside a much larger existing warehouse, which itself is part of a large industrial complex (b
No smoking signage refused due to heritage building
Retail-CI-v4 EQp2:Environmental Tobacco Smoke Controlposted by Joanna Peacock on
This project is located on Regent Street, which is a very famous, historical shopping street in London.
Plaza at grade building above.
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Paul Rogers on
I am working on a project where the exterior space consists of an alley way and an outdoor plaza. The outdoor plaza is on columns under the building volume.
Baseline outdoor airflow with EN 15251 and DCV
CS-v4 EAp2:Minimum energy performanceposted by Sandra Holmström on
Hi, We have a LEED v4 project (office building) were the project team want to use the CEN option for IEQp1 (using EN 15251 instead of ASHRAE 62.1). Also, for the energy modeling, the Proposed bui
Combination of New Build and Existing
NC-2009 EAp2:Minimum Energy Performanceposted by Jordan Kirrane on
Hello, I am working on the major renovation of an existing office building and new construction of a new entrance/reception atrium.
SSpc14 Walkable project Site
Pilot-Credits PC14:Walkable Streetsposted by R Jones on
I have recently applied this criteria to a Major Refurbishment project in an Urban setting. Has anyone looked at using this pilot credit for a Commercial interiors project?
>75% M&V Template Requirement
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Martin Meehan on
Dear all, Our project recently received the comment below which appears to require an Option B or D 'template' to be submitted with our plan if a tenant is to take 75% or more of the building spa
Lawn acceptance
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Patrice McVeigh on
Hi, We have received comments on the lawn areas of our project which states “lawn is acceptable only if it a) is not a monoculture, b) does not require regular maintenance or mowing, and c) does n