Forum quick links
Office building - Standard 62.1-2013 - Which toilet type?
CS-v4 EQp1:Minimum indoor air quality performanceposted by CHRISTOPHE MATHIEU on
Dear Leed user team, This question concerns the exhaust rate for toilets of an new office building.
Insulation between 2 slabs
NC-v4 EQc2:Low emitting materialsposted by Elodie DUMAS on
Hi, We have several interior spaces where insulation is between two concrete slabs.
Option 3-Approach 2 Commuter Survey - representative selection
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Christian Bösselmann on
In conducting the commuter survey according to Option 3 / Approach 2 I am would very much appreciate your feedback on the following topics. The multifunctional building is occupied by 1250 regular
Global Compliance Paths ASHRAE 62.1 & EN 15251 and EN 13779
NC-2009 IEQp1:Minimum IAQ Performanceposted by Ian McCall on
Dear All, The Global compliance Path guide book gives the option between ASHRAE 62.1-2007 or European standards EN 15251: 2007 and EN 13779: 2007. Question : Can we use the ventilation rates desc
short term bicycle racks for foreign visitors
NC-v4 LTc6:Bicycle facilitiesposted by Jade Deltour on
I work on an international conference center, in Brussels in Belgium, most of the visitors are foreigner. The mobility survey confirms that they will not come to the conference center by bike.
Checking oh IAQ management plan during construction
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Caroline PIN on
Dear all, I read it's necessary to do 3 date & time stamped visits with 6 photo for each visit to submet on LEED Online IEQ credit 3.1. It is true ?
Assembly Calculator for Materials with Recycled Content
NC-2009 MRc4:Recycled Contentposted by Caroline PIN on
Dear all, I use the assembly calculator for a product made with wood and aluminium.
Rating System Selection CI
posted by Christian Bösselmann on
Dear all I am hesitating whether the following project could obtain a CI certificate for the entire building: -existing office building -one entity owns the entire building -interior works will be
Waste management pro-rate surface logic for two buildings
CS-2009 MRc2:Construction Waste Managementposted by Ian McCall on
Dear LEEDers, Question : We would like to monitor & manage the construction waste for the whole site and then pro-rata by surface area the recycling percentage for each building office &
Chemical Anchorage Pins
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Amanda Johnson on
Hi are Chemical Anchorage Pins for structural concrete walls included in the scope of this credit? I am guessing not but want to check....