LEED online Substitution v4.1 for v4 MRC1: Submit 4 Points for Option 4 Path 4?
NC-v4.1 MRc1:Building Life-Cycle Impact Reductionposted by J Schütz on
Dear all,
Has anybody used microlouvers already?
NC-v4 EQc6:Interior lightingposted by Pierre-Antoine Legrand on
I am trying to figure out how to integrate microlouvers in a double-skin façade.
The architect has decided that only 50% of the louvers would be operated by the user...
Indoor Air Measurements: required measurement duration
EBOM-v4.1 EQp4:Indoor Environmental Quality Performanceposted by Roland Braun on
Hi to all:
CxA : independance of the design team
NC-v4 EAc1:Enhanced commissioningposted by Audrey LEDESERT on
In our office, we have 2 separate departments : one that works in building technicals (HVAC/San) and the 2nd that make consulting.
Baseline parking for a DATACENTER
CS-v4 LTc7:Reduced parking footprintposted by Marion THIBAULT on
Hi everyone,
how is considered Paris’ tramway ?
NC-v4 LTc5:Access to quality transitposted by Marion THIBAULT on
Hi everyone,
I have some trouble to determine if the Paris’ tramway corresponds to a streetcar or a lightrail regarding the LTc5 credit “Access to quality transit”.
how is considered Paris’ tramway ?
CS-v4 LTc5:Access to quality transitposted by Marion THIBAULT on
Hi everyone,
I have some trouble to determine if the Paris’ tramway corresponds to a streetcar or a lightrail regarding the LTc5 credit “Access to quality transit”.
Option 2 - Strategy F: work surfaces comply but no movable partitions in the project
NC-v4 EQc6:Interior lightingposted by Benjamin Weise on
We are planning to comply with the strategies A, B, C and F. The strategies A, B and C should not pose a problem. However, I am not sure about strategy F:
Tolerance within the achievement of criterias due to different affectations
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Audrey LEDESERT on
Hi,
I'm working on a project with administration affectation and some commercial surfaces on the groundfloor (surface < 40% of the total project surfaces).
Future renewable energy within the leed border
CS-v4 EAc5:Renewable energy productionposted by Instra Ingenieros on
Hi!