Hi to all:
We carry out indoor air measurements throughout Germany, including also for Leed certifications (so far Leed v3). Now I have a request for measurements according to Leed v4.1. A measurement time of 4 hours was required in Leed v3. Is there a required minimum measurement period in Leed v4.1? I haven't been able to find anything about it so far.