Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Question regarding Occupancy sensor

NC-v4 EAp1:Fundamental commissioning and verification
posted by  Nagaraj Sankar  on 

How can we show and  prove, here are the palces we gave an ocupancy and daylight sensor for manufacturing project? and Is there gudelines used to follow to place sensor on 

0
2
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Mon Dec 19, 2022, 4:16 am

Indoor Water Use Reduction Calculator v4.0

NC-v4.1 WEp2:Indoor Water Use Reduction
posted by  Dung Bui  on 

Hi everyone,

I'm currently working on the credit Indoor Water Use Reduction (Calculator 4.0 excel sheet) and have a question concerning fixture's design flow rate.

4
Mon Oct 17, 2022, 4:50 pm

Problem with Rainfall Event Calculator

NC-v4 SSc4:Rainwater management
posted by  Timothy Ian Middleton  on 

We have just realised that the percentile value given by the LEED Rainfall Event Calculator (https://www.usgbc.org/resources/leed-v4-rainfall-events-calculator) was incorrect, just before implement

2
Editorial Director
BuildingGreen, Inc.
LEEDuser Expert
159 thumbs up
Wed Oct 5, 2022, 5:03 pm

Pilot Credit

Pilot-Credits IPpc101:Integrative Process
posted by  AMIR ZULKHAIRI AHMAD BANGI  on 

As per the requirements of the pilot credit, we are noting our participation in this forum.

 

 

0

LEED O+M v4 Pilot Credit Participation

Pilot-Credits IPpc101:Integrative Process
posted by  AMIR ZULKHAIRI AHMAD BANGI  on 

As per the requirements of the pilot credit, we are noting our participation in this forum.

1
Mon Sep 19, 2022, 12:58 pm

Charging for bicycle facilities

NC-v4 LTc6:Bicycle facilities
posted by  Gregory Mason  on 

Is anyone aware of any explicit wording in LEEDv4 or v4.1 that explicitly states that bicycle parking needs to be provided free-of-charge?

0

Daylight sensors in a factory with skylight

NC-v4.1 EAp2:Minimum Energy Performance
posted by  Michael   on 

My factory project has skylights on the roof and when I told the MEP engineers that they need to install daylight sensors for daylight area under the skylight, they refused as changing th

1
Mon Sep 12, 2022, 10:00 pm

Install submeters for a factory with 90% of Process load

NC-v4 EAc3:Advanced energy metering
posted by  Michael   on 

My project is a factory with more than 90% of energy consumption coming from Process load (for production purposes).

1
Thu Sep 1, 2022, 4:59 pm