New addition to existing vs. MPR#2
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by maartje van roosmalen on
Existing (all
Fuel types of process energy
NC-2009 EAp2:Minimum Energy Performanceposted by Jatuwat Varodompun on
We have a new plant using NGV as a fuel to fry potato chip in Thailand.
Equipment Capacities for only one building pursue LEED
NC-2009 EAp2:Minimum Energy Performanceposted by Indochine Engineering VN on
Hi, I have a District energy system (chillers, boilers, cooling towers, pumps) serves 3 buildings but only 1 pursues LEED, so my project doesn't use total capacities of those equipments.
Hi all,
NC-2009 EAp2:Minimum Energy Performanceposted by Visu Boj on
I am working on a certification for a factory having less than 5 percent conditioned area. My process load is also high upto 75 percent.
Categorizing a LEED project
posted by Adi Negara, LEED AP BD+C on
Hello all, I have a difficulty in determining the appropriate LEED rating system for a project, and I hope that you all can tell me what rating system is best suited to the project: The project ow
Process Load of a factory applying LEED CS
CS-2009 EAp2:Minimum Energy Performanceposted by Jatuwat Varodompun on
I have a factory to be built for rent. Thus, this project goes for CS since we only build the shell.
Daylight dimming with manual electric curtain
NC-2009 EAp2:Minimum Energy Performanceposted by Jatuwat Varodompun on
My project has a dayligh dimming system and alos the curtain of each window. The reviewer ask me to add the effect of how this curtain will be modeled.
Air Curtain in conditioned space
NC-2009 EAp2:Minimum Energy Performanceposted by Jatuwat Varodompun on
How should we model the air curtain at the building entrance? Should we model as process load for both baseline and proposed?
Baseline HVAC Model System-8 VAV PFP Boxes with Outdoor Air Unit
NC-2009 EAp2:Minimum Energy Performanceposted by Ivan Priatman on
Dear LEED, We are designing a medical office with VRF system, to fulfill iaq requirements we add independent outdoor air unit comprises of supply and exhaust fans on each zone.
Minimum Ventilation rates for Production area
NC-2009 IEQp1:Minimum IAQ Performanceposted by sriram tetali on
Hi all Can u suggest the Ventilation rates for the Production / manufacturing areas for a Pharmaceutical clients because ASHRAE doesn't mention any for the Production in the Table 6-1