Brownfield site but graded before the construction started

NC-2009 SSc3:Brownfield redevelopment
posted by  Michael Wahjudi  on 

Our site is brownfield (existing navy base), but the site is being graded before 1980 to be prepared as industrial area. The current construction activity start at 2014.

2
Principal
Studio4, LLC
LEEDuser Expert
120 thumbs up
Tue Jun 9, 2015, 4:02 am

Baseline HVAC system choice

NC-2009 EAp2:Minimum energy performance
posted by  Jatuwat Varodompun  on 

Let's Say this building is 26,000 sf which the baseline is system 5-6. What if the exception area is 10,000 sf (process load difference >10 Btu/h ft).

5
Default Avatar
Energy Modeler
KJWW Engineering
LEEDuser Basic Member
3 thumbs up
Tue May 26, 2015, 3:02 pm
2
Default Avatar
senior sustainable design consultant
Kaer Pte Ltd
LEEDuser Basic Member
2 thumbs up
Mon May 18, 2015, 1:20 pm

Fuel types of process energy

NC-2009 EAp2:Minimum energy performance
posted by  Jatuwat Varodompun  on 

We have a new plant using NGV as a fuel to fry potato chip in Thailand.

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4460 thumbs up
Sat May 9, 2015, 1:23 am

Equipment Capacities for only one building pursue LEED

NC-2009 EAp2:Minimum energy performance
posted by  Indochine Engineering VN  on 

Hi, I have a District energy system (chillers, boilers, cooling towers, pumps) serves 3 buildings but only 1 pursues LEED, so my project doesn't use total capacities of those equipments.

5
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4460 thumbs up
Thu May 7, 2015, 4:15 pm

Hi all,

NC-2009 EAp2:Minimum energy performance
posted by  Visu Boj  on 

I am working on a certification for a factory having less than 5 percent conditioned area. My process load is also high upto 75 percent.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4460 thumbs up
Fri Apr 17, 2015, 5:03 am

Categorizing a LEED project

LEED Rating System Selection
posted by  Adi Negara, LEED AP BD+C  on 

Hello all, I have a difficulty in determining the appropriate LEED rating system for a project, and I hope that you all can tell me what rating system is best suited to the project: The project ow

2
Thu Apr 2, 2015, 2:48 pm

Process Load of a factory applying LEED CS

CS-2009 EAp2:Minimum energy performance
posted by  Jatuwat Varodompun  on 

I have a factory to be built for rent. Thus, this project goes for CS since we only build the shell.

3
Tue Mar 31, 2015, 3:32 pm

Daylight dimming with manual electric curtain

NC-2009 EAp2:Minimum energy performance
posted by  Jatuwat Varodompun  on 

My project has a dayligh dimming system and alos the curtain of each window. The reviewer ask me to add the effect of how this curtain will be modeled.

3
Tue Mar 31, 2015, 2:25 pm

Air Curtain in conditioned space

NC-2009 EAp2:Minimum energy performance
posted by  Jatuwat Varodompun  on 

How should we model the air curtain at the building entrance? Should we model as process load for both baseline and proposed?

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4460 thumbs up
Tue Mar 31, 2015, 1:20 am