Kitchen faucet nominal flow rate vs maximum flow rate
CI-v4 WEp1:Indoor water use reductionposted by shashank gangil on
We are doing a CI project in Hong Kong and going to select a kitchen faucet for installation in the pantry.
rainwater recovery at inside boundary, store at outside boundary, Can it be used as a calculation of potable water reduction?
NC-v4 WEp1:Outdoor water use reductionposted by Ray Hsing Chen on
LEED V4 BD+C (NC) project,
USGBC rainfall events calculator
NC-v4 SSc4:Rainwater managementposted by Leanne Niu on
We could not get the 10 years of the historic daily rainfall data, if we could leave the sheet of historical data blank? and how we calculate the total runoff we need to control on site?&
Baseline System selection for Datacenter
Data-Centers-NC-v4 EAp2:Minimum energy performanceposted by J.W. Shin on
Hi every one, Marcus
I am doing data center energy modeling for LEED V4.
The data center is composed of 3 type spaces.
Paints for Artwork
CI-v4 EQc2:Low emitting materialsposted by Felicity Lee on
Hi All,
I have a small office project where we are going to do wall artwork and to be painted by artists on-site.
VRV that controls laboratory ambient temperature should be classified as HVAC system or process
NC-v4 EAp2:Minimum energy performanceposted by SOLON YANG on
I encountered this situation when building the energy model: the laboratory's ambient temperature control was provided by VRV, which was closed, mainly for equipment testing, and the personnel
Diverse uses - Shops in a shopping mall as tenants
CI-v4 LTc2:Surrounding density and diverse usesposted by Megumi Horii on
Can shops in a shopping mall as tenants be counted seperately or as "several shops in 1 shopping mall = 1 shop"?
Cooling Tower drift eliminator - standards for processes
NC-v4 WEp2:Indoor water use reductionposted by Dionisio Franca on
We checked the drift eliminator specs with the manufacturer selected for our project and they told us that that their draft eliminators reduce drift to 0.05% only.
Quick EV charger
NC-v4 LTc8:Green vehiclesposted by Noriko Nagazumi on
Hello, We understand that EV charger with capacity to make a car full charged in 8 hours could be counted as one under v2009, so quick charger which has capacity of charging a car to full in 2 hou
4VOC certification
CI-v4 EQc2:Low emitting materialsposted by DAVE LI on
Japan has a Third Party certification called 4 VOC.
This certification carries out relevant tests on Toluene, xylene, ethylbenzene, and styrene, and sets benchmark values.