25 feet (7.5 meter) Smoking Prohibition

EBOM-v4 EQp2:Environmental Tobacco Smoke Control
posted by  Wes Baek  on 

Hi all,

Is there any alternative when our team cannot implement 25 feet smoking prohibition policy due to a restricted project area?

1
Tue Nov 21, 2017, 11:41 pm

What's the size requirement for a Data Center Project with LEED v4 BC+D and O+M?

EBOM-v4 MPR3:Must comply with project size requirements
posted by  Xiaoyu Cao  on 

Hi,

I see the minimum size requirements for BD+C and O+M is ,

"LEED BD+C and LEED O+M Rating Systems

1
Thu Nov 2, 2017, 4:12 pm
4
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Mon Oct 9, 2017, 10:19 am

LEED v4 projects that demonstrate compliance using ASHRAE 90.1-2013

NC-v4 EAc2:Optimize energy performance
posted by  Vina Vales  on 

Is there a different Table 1: ASHRAE 90.1-2013 Appendix G percentage Improvement that we can use for those projects under LEED v4 but using ASHRAE 90.1-2013?

If so, please forward.

1
Fri Oct 6, 2017, 2:52 pm

EB Certification process before the construction is finished

Performance Period
posted by  JEONGJAE LEE  on 

Hello, I have a question about the EB certification process since it is my first job having work on O+M project. I would be very thankful if I would be able to get any answer on it here.

1
Thu Nov 16, 2017, 11:41 pm

shuttle buses

NC-2009 SSc4.1:Alternative transportation - public transportation access
posted by  Weidong Luo  on 

there are 8 stops/stations within 1 mile radius form our project serving 47 public bus/light rail lines, and 2 of them are municipal public transportation hubs that connect the vicinity to downtown

1
Mon Feb 9, 2015, 3:05 am

Janitor closet inside restroom

NC-2009 IEQc5:Indoor chemical and pollutant source control
posted by  Chen Jin  on 

In our project, each janitor closet (only for the storage of cleaning equipment and common deterdent) is placed inside a restroom, occupying a toilet cubicle.

1
Tue Aug 18, 2015, 3:42 pm

printing room in an open office

CI-2009 IEQc5:Indoor chemical and pollutant source control
posted by  ANNA SUN  on 

a small printing room in an open office, no enclosure for the printing room. but on the top of the printing room, we have an exhaust fan for pollution air. so can we earn IEQ credit5

1
Thu Mar 17, 2016, 1:45 pm

Low-Emitting Content Criteria for Wallcovering in EBOM v2009

EBOM-2009 MRc3:Sustainable purchasing - facility alterations and additions
posted by  Noriko Nagazumi  on 

Do you have any idea for Low-Emitting Content (VOC) criteria of wallcovering like adhesives or sealants for LEED EBOM v2009 projects? Our project is an office building, and vinyl wallcoverings in s

1
Fri Aug 12, 2016, 6:34 pm

Purchased energy rate

CS-v4 EAp2:Minimum energy performance
posted by  Shenhao Li  on 

Hi all, We have a LEED v4 CS project which use purchased chilled water and purchased heat.

1
Mon Jun 19, 2017, 1:28 pm