Forum quick links
refrigerant reccovery
NC-2009 EAp3:Fundamental refrigerant managementposted by Faisal on
in EAp3 it says that there should be an EPA approved refrigerant recovery technician, is this requirement also for temporary units(like site offices site warehouse etc) or it is only for permanentl
Survey Participants
EBOM-2009 IEQc2.1:Occupant comfort - occupant surveyposted by Fareed Alghimlas on
We’re working towards the certification of a large office building, where a good portion of the (FTEs) are subcontractors who spend time (minimum 40hrs/week) in the building but don’t necessarily h
Number of transients for FTE calculation
posted by Sunanda Swain, LEED AP BD+C, PQP on
Hi, I am working on a LEED for Healthcare project (LEED HC v2009). At the moment I am filling out the scorecards. I am bit confused about calculating number of pick hour transients.
Greenfield or previously developed?
NC-2009 SSc5.1:Site development - protect or restore habitatposted by Ilan Yahav on
I'm wondering if a project I'm working on, situated near the coast in Israel, is considers a greenfield or developed area.
Stormwater Management Plan
NC-2009 SSc6.2:Stormwater design - quality controlposted by Nisreen Alhussein on
I cant find clear cut for Stormwater Management Plan definition, i mean is it using both structural and non structural plans to achieve stormwater quality control?
Narrative for Option 2 Contractor confimration
NC-2009 IEQc3.1:Construction IAQ management plan - during constructionposted by Saud Abdul Rasheed on
Hi all, We are not going to provide photos for this credit but we have an IAQ plan developed and the contractor has been following it according to the credit requirement.
Chilled water flow and pipe sizes
CI-2009 EAc1.3:Optimize energy performance - HVACposted by Jayakumar Pamuri on
Hi All, I am here to post my query about chilled water system,flow and pipe sizes.
Proposed case cooling capacity reducing energy savings
NC-2009 EAc1:Optimize energy performanceposted by SSN Energy Model on
Hi, I am doing energy simulation for G+4 Labor Accommodation building. In base case, i have considered 2.66 COP.
EAc 5.1 for LEED C&S
CS-2009 EAc5.1:Measurement and verification - base buildingposted by S Nagarajan on
Dear Sir I am involved in a 5-storey building. The base building loads are mixed loads, i.e the loads include lighting and small power.