LEED EBOM Eligibility
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Amgad Khattab on
We have a huge existing building which is internally divided into five separate buildings. Each building has its own owner. Can we get LEED EBOM certificate for only one of these buildings?
Basement That Extends to Plot line
NC-2009 WEc1:Water Efficient Landscapingposted by Omar Elrawy on
Hi, My project has two levels basement that extends to the land's plot line, while the above-grade floors are much smaller areas than the basement area.
CxA role
NC-2009 EAc3:Enhanced Commissioningposted by Abdulla Anwar on
Can you advise the CxA role if it was a part of Owner organization? .......................... by the way what is the commissioning developed plan CxP?
Concrete as Temp barriers
NC-2009 MRc2:Construction Waste Managementposted by Ahmad Gabir on
Hi , We are working on Mega project is Saudi Arabia where we are using the concrete waste to build Safety road/excavation barriers which will be used on site during construction instead of purchasi
Floor Coatings Compliance with IEQc4.3 in LEED 2009
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Mario S. on
We have a concrete floor, and we plan on putting a coating on top of the concrete finish.
Shopping mall and Community Connectivity
posted by Nadia Azzam on
My project is a mall that is planned to serve a district level; it definately includes at least 10 of the basic services listed in Appendix 1.
A partial ceiling area was affected by mold
Schools-2009 IEQc10:Mold Preventionposted by dia2000@gmail.com dia2000@gmail.com on
Hello, Our project is a LEED NC v2009. Due to a heavy rain season, it happened that some leakage lead to a partial grow of mold in some ceiling areas which are made from gypsum boards.
LEED Group C&S - Applicable Cooling source in Propose case
CS-v4 EAp2:Minimum energy performanceposted by Ashraf Ali Khan Khan on
I am modelling for LEED GROUP - v4 BD+C: CS. Project has 40 Office buildings shared with same basement and served with multiple Water Cooled Chillers as cooling source.
Gypsum board recycling resource, Saudi Arabia
NC-2009 MRc2:Construction Waste Managementposted by Shreepad Bandagi on
Wondering if anyone would have a resource for gypsum board recycling anywhere in Saudi Arabia. Thanks!
Concerning Underground Basements
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Omar Elrawy on
Dear all, My project is two underground basement parking floors, that are built on the total land area, while the above-grade floors are built on 30% of the total land area. Should I