Basement That Extends to Plot line

NC-2009 WEc1:Water Efficient Landscaping
posted by  Omar Elrawy  on 

Hi, My project has two levels basement that extends to the land's plot line, while the above-grade floors are much smaller areas than the basement area.

1
Fri Mar 11, 2016, 9:49 am

CxA role

NC-2009 EAc3:Enhanced Commissioning
posted by  Abdulla Anwar  on 

Can you advise the CxA role if it was a part of Owner organization? .......................... by the way what is the commissioning developed plan CxP?

1
Tue Aug 9, 2016, 3:27 pm

Concrete as Temp barriers

NC-2009 MRc2:Construction Waste Management
posted by  Ahmad Gabir  on 

Hi , We are working on Mega project is Saudi Arabia where we are using the concrete waste to build Safety road/excavation barriers which will be used on site during construction instead of purchasi

1
Tue Nov 29, 2016, 2:05 pm

DEC - EBOM

EBOM-2009 WEc4:Cooling Tower Water Management
posted by  babu rajendran  on 

My project getting chilled water from District energy center which has cooling towers.

1
Wed Dec 10, 2014, 5:35 pm

Reduced Parking Footprint Calculation

NC-v4 LTc7:Reduced parking footprint
posted by  Sefa Sahin  on 

The project building is gallery, museum. Museum category is not included in the Table - Base Ratios for parking spaces, by building type. What is the best option for calculation it?

1
Thu Mar 30, 2017, 3:07 pm

Concerning Underground Basements

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Omar Elrawy  on 

Dear all, My project is two underground basement parking floors, that are built on the total land area, while the above-grade floors are built on 30% of the total land area. Should I

1
Wed Nov 11, 2015, 8:56 pm

Duct Seal level

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Sarfaraj Khan  on 

Minimum duct seal level must comply with table 6.4.4.2A- Ashrae 90, i have this in my specification for duct and i think it apply only to G.I Duct, Not to pre insulated duct, please anyone can clar

0

Number of IAQ samples required ?

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Michael Boyle  on 

Our project consists of (5 townhouse + multipurpose room). This is considered as one building.

1
Wed Apr 13, 2016, 11:09 am

EAc1 points using DES Option 1 + A lot of Renewables

NC-2009 EAc1:Optimize Energy Performance
posted by  Reniel Barroso  on 

We have a project opting to get the maximum 19 credit points in EAc1.

1
Wed Aug 31, 2016, 3:45 pm

An example of a ducument for Prerequisite 2

ND-Plan-v4 SLLp2:Imperiled species and ecological communities
posted by  oko Yael  on 

Hello Eliot, We are in a process of preparing the prerequisites documents for the first LEED ND project in Israel. All other prerequisites are technically clear. Prerequisite 2 is somehow softer.

1