Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Concrete as Temp barriers

NC-2009 MRc2:Construction Waste Management
posted by  Ahmad Gabir  on 

Hi , We are working on Mega project is Saudi Arabia where we are using the concrete waste to build Safety road/excavation barriers which will be used on site during construction instead of purchasi

1
Tue Nov 29, 2016, 2:05 pm

DEC - EBOM

EBOM-2009 WEc4:Cooling Tower Water Management
posted by  babu rajendran  on 

My project getting chilled water from District energy center which has cooling towers.

1
Wed Dec 10, 2014, 5:35 pm

Reduced Parking Footprint Calculation

NC-v4 LTc7:Reduced parking footprint
posted by  Sefa Sahin  on 

The project building is gallery, museum. Museum category is not included in the Table - Base Ratios for parking spaces, by building type. What is the best option for calculation it?

1
Thu Mar 30, 2017, 3:07 pm

LEED EBOM Eligibility

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Amgad Khattab  on 

We have a huge existing building which is internally divided into five separate buildings. Each building has its own owner. Can we get LEED EBOM certificate for only one of these buildings?

1
Tue Aug 25, 2015, 1:18 pm

Basement That Extends to Plot line

NC-2009 WEc1:Water Efficient Landscaping
posted by  Omar Elrawy  on 

Hi, My project has two levels basement that extends to the land's plot line, while the above-grade floors are much smaller areas than the basement area.

1
Fri Mar 11, 2016, 9:49 am

CxA role

NC-2009 EAc3:Enhanced Commissioning
posted by  Abdulla Anwar  on 

Can you advise the CxA role if it was a part of Owner organization? .......................... by the way what is the commissioning developed plan CxP?

1
Tue Aug 9, 2016, 3:27 pm

EAc1 points using DES Option 1 + A lot of Renewables

NC-2009 EAc1:Optimize Energy Performance
posted by  Reniel Barroso  on 

We have a project opting to get the maximum 19 credit points in EAc1.

1
Wed Aug 31, 2016, 3:45 pm

An example of a ducument for Prerequisite 2

ND-Plan-v4 SLLp2:Imperiled species and ecological communities
posted by  oko Yael  on 

Hello Eliot, We are in a process of preparing the prerequisites documents for the first LEED ND project in Israel. All other prerequisites are technically clear. Prerequisite 2 is somehow softer.

1
Tue Dec 13, 2016, 9:56 pm

Floor Coatings Compliance with IEQc4.3 in LEED 2009

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Mario S.  on 

We have a concrete floor, and we plan on putting a coating on top of the concrete finish.

1
Fri Feb 10, 2017, 7:05 pm

Shopping mall and Community Connectivity

General forums
posted by  Nadia Azzam  on 

My project is a mall that is planned to serve a district level; it definately includes at least 10 of the basic services listed in Appendix 1.

1
Thu Dec 4, 2014, 9:36 pm