Basement That Extends to Plot line
NC-2009 WEc1:Water Efficient Landscapingposted by Omar Elrawy on
Hi, My project has two levels basement that extends to the land's plot line, while the above-grade floors are much smaller areas than the basement area.
CxA role
NC-2009 EAc3:Enhanced Commissioningposted by Abdulla Anwar on
Can you advise the CxA role if it was a part of Owner organization? .......................... by the way what is the commissioning developed plan CxP?
Concrete as Temp barriers
NC-2009 MRc2:Construction Waste Managementposted by Ahmad Gabir on
Hi , We are working on Mega project is Saudi Arabia where we are using the concrete waste to build Safety road/excavation barriers which will be used on site during construction instead of purchasi
DEC - EBOM
EBOM-2009 WEc4:Cooling Tower Water Managementposted by babu rajendran on
My project getting chilled water from District energy center which has cooling towers.
Reduced Parking Footprint Calculation
NC-v4 LTc7:Reduced parking footprintposted by Sefa Sahin on
The project building is gallery, museum. Museum category is not included in the Table - Base Ratios for parking spaces, by building type. What is the best option for calculation it?
Concerning Underground Basements
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Omar Elrawy on
Dear all, My project is two underground basement parking floors, that are built on the total land area, while the above-grade floors are built on 30% of the total land area. Should I
Duct Seal level
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Sarfaraj Khan on
Minimum duct seal level must comply with table 6.4.4.2A- Ashrae 90, i have this in my specification for duct and i think it apply only to G.I Duct, Not to pre insulated duct, please anyone can clar
Number of IAQ samples required ?
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Michael Boyle on
Our project consists of (5 townhouse + multipurpose room). This is considered as one building.
EAc1 points using DES Option 1 + A lot of Renewables
NC-2009 EAc1:Optimize Energy Performanceposted by Reniel Barroso on
We have a project opting to get the maximum 19 credit points in EAc1.
An example of a ducument for Prerequisite 2
ND-Plan-v4 SLLp2:Imperiled species and ecological communitiesposted by oko Yael on
Hello Eliot, We are in a process of preparing the prerequisites documents for the first LEED ND project in Israel. All other prerequisites are technically clear. Prerequisite 2 is somehow softer.