LEED Boundaries & Construction Boundaries
NC-2009 SSp1:Construction Activity Pollution Preventionposted by soha yamani on
ESC Plan and Project LEED Boundary in Campus project we are working on a campus LEED project that have four different contractors working on four different buildings that will be registered for LE
Occupancy Density and Fresh Air Calculation
NC-v4 EAp2:Minimum energy performanceposted by Ahmed Labeeb on
Dear,
100% Previously Developed Site with National trees
NC-v4 SSc2:Site development - protect or restore habitatposted by Ahmed Labeeb on
We are working on a project located in Dubai, UAE. The total site area was previously developed by an old owner.
Non SRI compliant material over Excellent SRI material
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Faisal on
What if a roof slab which is covered with an assembly having excellent SRI(>78) & U V values as per Energy modeling requirement, is covered with an non-compliant material (say grey gra
Dedicated Smoking area for Group Building with distance less than 25 ft
NC-v4 EQp2:Environmental tobacco smoke controlposted by Ashraf Ali Khan Khan on
We are currently working on NC V4 Group buildings. Project is G+2 with total of 100 buildings and distance between the buildings are less than 25 feet.
Meeting ASHRAE 90.1 COP Requirement in Proposed Case Energy Simulation
NC-2009 EAp2:Minimum Energy Performanceposted by Sasha Peters on
We recently received a comment from USGBC LEED that we have to meet ASHRAE 90.1 COP requirement in proposed case energy simulation as well.
Carpark surfaces
CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Ekin Caglar Gokbas on
Hi everybody. I have a problem in the project which i am leading the LEED certification. We have parking areas inside of the building basement floor.
EER Clarification for Typical Floors
NC-2009 EAp2:Minimum Energy Performanceposted by SSN Energy Model on
Hi,
LEED ND Plan - Is it a permanent certification
posted by Mahesh M on
We are prospecting a development in the middle-east for LEED ND certification under V4.
design case water calculation
NC-v4 WEc2:Indoor water use reductionposted by Azaz Ansari on
why is the no information required to enter in design water calculation to accomodate visitors?
Please note we have visitor column in calculation sheet.