Forum quick links
Volume to Weight Conversion factors
NC-2009 MRc2:Construction Waste Managementposted by Yohaan Cama on
Hi All,
LEED v4 EBOM - Commissioning
EBOM-v4 EAc2:Existing building commissioning - implementationposted by Aber Alvi on
A project for which level 2 energy audit had been carried out and implemented more than a year ago, can that energy audit report and the measurement and verification results from the
Option 2. Prescriptive Compliance
CI-v4 EAp2:Minimum energy performanceposted by Sustainability Provider on
We are pursuing for LEED v4 certification for an office space under CI category.
Post occupancy assesment
NC-v4 EQc4:Indoor air quality assessmentposted by eran ben kennaz on
I was asked by the client to collect air samples now- a month after occupancy (he says he forgot to call me before.......). Would that be acceptable when they send in the reports?
CI Office v2009 - Water Cooled Chiller in Base Case & DCP in Proposed Case
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by SSN Energy Model on
Hi All,
Greetings!
Any minimum area for Roof after exclusions?
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Orçun Özhelvaci on
Hello,
Short-term bicycle
NC-v4 LTc6:Bicycle facilitiesposted by Flavia Marques on
does any one know what is the difference between the cycle racks provided for short term and long term storage (i don't mean percentage wise)?
How "Uber" can serve the quality transit?
NC-v4 LTc5:Access to quality transitposted by Ahmed Abunada on
Hello,
LED lamps
EBOM-v4 MRc2:Purchasing - lampsposted by Karim Farah on
The LEED guideline states that “Mercury-free lamps, such as LEDs, can be included in the pictogram per lumen-hour calculations only if their energy efficiency levels are equal to or greater than th