Log in
LEED v4
Existing Buildings
Energy and Atmosphere
Existing building commissioning - implementation

LEED CREDIT

EBOM-v4 EAc2: Existing Building Commissioning—Implementation 2 points

See all forum discussions about this credit »

SPECIAL REPORT

LEEDuser expert

Rock Ridolfi

CEM, CxA, LEED AP BD+C, O+M

Engineering Economics, Inc.
Associate

SPECIAL REPORT

LEEDuser’s viewpoint

Frank advice from LEED experts

LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Establishment

Meet the requirements of EA Credit Existing Building Commissioning—Analysis.

Performance

Apply the requirements below to all direct energy-consuming or energy-producing systems, including lighting, process loads, HVAC&R, domestic water heating, and renewable energy. Implement no- or low-cost operational improvements and develop a five-year plan for equipment replacement and major modifications or upgrades based on the analysis phase. Confirm training of building operations staff so that they can efficiently operate all new or substantially altered building equipment or systems. Develop a formal tracking and verification program for all projects implemented as part of the existing building commissioning process. Include verification of effectiveness, documentation of the observed financial costs and benefits, and observed or estimated environmental and human health and comfort benefits. Update the operations and maintenance plan and the current facilities requirements to incorporate the newly implemented improvements. See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

Frequently asked questions

What constitutes a “low-cost” measure?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

What does the training for building personnel need to cover?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

See all forum discussions about this credit »

Addenda

1/27/2017Updated: 1/27/2017
Reference Guide Correction
Description of change:
Under Group Approach, replace the sentence "All buildings in the group may be documented as one." with the following text: "Documentation may be combined provided it addresses each building individually (e.g., low-cost measures must be implemented at each building in the group, etc.). "
Campus Applicable
No
Internationally Applicable:
Yes
See all forum discussions about this credit »

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

LEEDuser expert

Rock Ridolfi

CEM, CxA, LEED AP BD+C, O+M

Engineering Economics, Inc.
Associate

Get the inside scoop

Our editors have written a detailed analysis of nearly every LEED credit, and LEEDuser premium members get full access. We’ll tell you whether the credit is easy to accomplish or better left alone, and we provide insider tips on how to document it successfully.

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Establishment

Meet the requirements of EA Credit Existing Building Commissioning—Analysis.

Performance

Apply the requirements below to all direct energy-consuming or energy-producing systems, including lighting, process loads, HVAC&R, domestic water heating, and renewable energy. Implement no- or low-cost operational improvements and develop a five-year plan for equipment replacement and major modifications or upgrades based on the analysis phase. Confirm training of building operations staff so that they can efficiently operate all new or substantially altered building equipment or systems. Develop a formal tracking and verification program for all projects implemented as part of the existing building commissioning process. Include verification of effectiveness, documentation of the observed financial costs and benefits, and observed or estimated environmental and human health and comfort benefits. Update the operations and maintenance plan and the current facilities requirements to incorporate the newly implemented improvements.

In the end, LEED is all about documentation. LEEDuser’s Documentation Toolkit, for premium members only, saves you time and helps you avoid mistakes with:

  • Calculators to help assess credit compliance.
  • Tracking spreadsheets for materials purchases.
  • Spreadsheets and forms to give to subs and other team members.
  • Guidance documents on arcane LEED issues.
  • Sample templates to help guide your narratives and LEED Online submissions.
  • Examples of actual submissions from certified LEED projects.

What constitutes a “low-cost” measure?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

What does the training for building personnel need to cover?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

1/27/2017Updated: 1/27/2017
Reference Guide Correction
Description of change:
Under Group Approach, replace the sentence "All buildings in the group may be documented as one." with the following text: "Documentation may be combined provided it addresses each building individually (e.g., low-cost measures must be implemented at each building in the group, etc.). "
Campus Applicable
No
Internationally Applicable:
Yes

LEEDuser expert

Rock Ridolfi

CEM, CxA, LEED AP BD+C, O+M

Engineering Economics, Inc.
Associate

See all LEEDuser forum discussions about this credit » Unsubscribe from discussions about EBOM-v4 EAc2