Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent
2
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Tue Oct 26, 2021, 12:06 pm

Project pertaining to only the third floor of a building

CI-v4 EAc2:Optimize energy performance
posted by  Peter Downar  on 
  1. The project pertains to a fit-up of only the 3rd floor of a multi-floor building.
1
Fri Oct 29, 2021, 5:26 pm

Greenguard for plywood

NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  Erin Holdenried  on 

IS Greenguard certification plus an attestation from the manufacturer that there is no formaldehyde acceptable for plywood products? 

2
Fri Oct 22, 2021, 9:08 pm
12
Engineering Project Assistant
Jacobs Engineering Group
LEEDuser Premium Member
0 thumbs up
Mon Oct 18, 2021, 10:06 pm

Is Zone Outdoor Airflow meets or exceeds for all zones required?

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Justin Shultz  on 

We are working with a "Dayroom" space that has the following requirements: 4 ACH of Outdoor Air and 4 ACH of Total Air.

3
Default Avatar
Senior Manager - Sustainable Services
Surmount
LEEDuser Basic Member
29 thumbs up
Mon Oct 18, 2021, 4:31 am
2
Sustainable Design Lead
CannonDesign
LEEDuser Expert
379 thumbs up
Mon Oct 18, 2021, 4:29 am

Environmental Management Systems

LEED v4.1 Discussion Forum
posted by  Jesse Schildt  on 

I’m a student researching the perceptions of US construction professionals on the implementation of environmental management systems in construction.

0

IAQ Documentation with Corrective Action

NC-v4 EQc3:Construction indoor air quality management plan
posted by  Juanita Garcia  on 

My project team puts together reports that includes pictures of conditions that to be addressed with SMACNA Control measures and includes photos of corrected conditions.

1
Mon Dec 6, 2021, 11:20 am

Exterior Wall Continuous Insulation - Formaldehyde-Free Requirements/Certifications

NC-v4.1 EQc2:Low-Emitting Materials
posted by  Catherine Blakemore  on 

I have a project that has a large amount of curtain wall.  Where the glazing is opaque, the curtain wall will be covered by continuous foil-faced, mineral wool board insulation.  None of

0