Forum quick links
No EPD for Concrete
NC-v4.1 MRc1:Building Life-Cycle Impact Reductionposted by Aishwarya Katta on
Hi All,
bus rapid transit stop
NC-v4 LTc6:Bicycle facilitiesposted by Erin Holdenried on
what is the definition of a bus rapid transit stop? Can a bus transfer station count towards this? or Greyhound station? I have a project that can meet all the criteria except this one.
Lowest flow shower on the market
NC-v4 WEp2:Indoor water use reductionposted by Sophie Kerr on
What is the lowest flow shower you've come across? The lowest we have is 5.7 LPM (1.5 GPM).
No New parking added at park shelter
NC-v4.1 LTc7:Reduced Parking Footprintposted by akshaya bhaskar on
Our project is a park shelter with 150 occupants at peak occupancy over the weekend. Local ordinances do not have a minimum parking requirement.
food scrap vs compost
Pilot-Credits SSpc129:Comprehensive Compostingposted by Brightworks Sustainability on
One thing to consider, at least in California, is how to compost both food scrap and plant materials in commercial offices? For example the City of Sunnyvale requires food scrap composting in
Pilot Question Surveys
NC-v4 INc1:Innovationposted by Theresa Lehman on
I have completed the USGBC Pilot Credit Feedback Survey twice.
"Everything within the waterproofing membrane"
NC-v4.1 EQc2:Low-Emitting Materialsposted by James Keohane on
The credit language states that materials which must meet the requirements are "everything within the waterproofing membrane."
How to Model Units that are sized for Dehumidification in Labs
NC-v4 EAp2:Minimum energy performanceposted by Rajat Wadhwa on
Hi,
Helpful links to complete Site Assessment worksheet
NC-v4.1 SSc1:Site Assessmentposted by Micah McLain on
Which websites do you all use to complete your Site Assessment worksheets for US-based projects?
Prescriptive Compliance - Documentation?
CI-v4.1 EAp2:Minimum Energy Performanceposted by Edgar Arevalo on
So how should one pursue the prescriptive method for this prerequisite? In the sample form, it says to provide documentation demonstrating compliance with ASHRAE 90.1-2016, Sections 5 though