Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Modeling Proposed and Baseline System

CI-v4 EAc2:Optimize energy performance
posted by  Rajat Wadhwa  on 

Hi Everyone, I am working on a 10,000 sqft tenant fit out LEED project, the building is close to 250,000 sqft building with 5 stories.

1
Sun Mar 26, 2023, 8:51 pm

Entire floor area counts if at least 75% has a view?

NC-v4 EQc8:Quality views
posted by  Martha Norbeck  on 

The v2009 view credit included this provision: "For private offices, the entire floor area of the office may be counted if 75% or more of the area has a direct line of sight to perimeter vision gla

2
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Thu Mar 16, 2023, 3:52 pm

95 percentile calculation

EBOM-v4.1 SSc1:Rainwater Management
posted by  Ann Pieper  on 

The Rainfall Events Calculator, Historical Data tab, shows the 95th percentile storm calculation as a function of TOTAL ANNUAL Precipitation.  Is that correct?  

2
Wed Mar 15, 2023, 5:34 pm

showers required in retail

Retail-NC-v4 LTc6:Bicycle facilities
posted by  Deborah Stadler  on 

For LEED v4 NC Retail are showers required?  For LEED v4 CI Retail are showers required?  The credit language and guide specifically appear to explicitly exclude showers in CI Retail, but

0

Option 2-measurements

EBOM-v4.1 SSc3:Light Pollution Reduction
posted by  Ann Pieper  on 

Where exactly do should the Option 2 measurements be taken?  i.e. a certain distance above the light source? on the roof?  

1
Wed Jul 12, 2023, 7:07 pm

Documentation for No Cooling Tower

Pilot-Credits WEpc94:No Cooling Tower
posted by  Marelle Davey  on 

Hi everyone,

Just wondering what documentation have folks used to achieve this credit? Is any documentation required besides mechanical drawings? 

Thanks!

2
Sustainability Consultant
WSP
LEEDuser Expert
0 thumbs up
Tue Mar 14, 2023, 8:20 am

Integrative Process Facilitator

LEED v4.1 Discussion Forum
posted by  Edward Reifenstein  on 

The Integrative Process credit for v4.1 BD+C: New Construction refers to an "Integrative Process Facilitator" who has responsibility for running the early charrette and tracking the results, u

2
CEO
Green Commons, LLC
LEEDuser Expert
586 thumbs up
Sun Mar 12, 2023, 3:53 am
3
Sat Mar 11, 2023, 12:30 am