Forum quick links
LEED Timeline / Schedule
posted by on
Hello! Is there a timeline of when certain credits need to be completed or started during the interior design of a project?
Thanks
Advanced Metering for district cooling
NC-v4 EAc3:Advanced energy meteringposted by Camilo Velez on
Hi all,
We have encountered a peculiar situation in our project due to a couple of factors:
No smoking signage without words
NC-v4 EQp2:Environmental tobacco smoke controlposted by Heather Belsey on
I'm working on a healthcare project where the client is planning on using just the no smoking symbol on the door with no words or 'language' attached. Just the cigarette crossed out - Is this
HPD Disclosure Threshold
NC-v4.1 MRc4:Material Ingredientsposted by Gretchen Krumm on
LEED manual clearly says that an HPD must report ingredients at or above 0.1% for compliance with Option 1.
Can you use nearby census tracts?
NC-v4.1 LTc3:High Priority Site and Equitable Developmentposted by Jackson Ludwig on
Working on a confidential project that is commercial/industrial, and the site has its own census tract. There are nearby tracts to the North, East, and South of the site. The North and
Monitoring and Corrective action plan
Pilot-Credits SSpc55:Bird collision deterrenceposted by Luis Huertas on
I am working on developing the required monitoring plan, but in conversations with the American Bird Conservation manager, drafting a plan for a new building cannot be drafted in the way the requir
Total Materials Cost vs Total Value of Sustainable Materials Cost
NC-v4.1 MRc3:Sourcing of Raw Materialsposted by Chloe Naese on
Hi everyone, I was wondering what the difference is between the "Total Materials Cost" and "Total Value of Sustainable Materials Costs (unweighted)" in the BPDO calculator?
Metering of chilled water
NC-v4 WEc4:Water meteringposted by Nadia Azzam on
Our project comprises of two buildings- building 1 is existing, building 2 is new. We are only seeking LEED certification for building 2.
Wooded Area as open space?
NC-v4.1 SSc3:Open Spaceposted by Nadia Azzam on
Would a wooded area with lots of trees count as open space for this credit? Our project is surrounded by wooded areas that are basically greenfield areas with trees.