Hello! Is there a timeline of when certain credits need to be completed or started during the interior design of a project? 

Thanks

0

Advanced Metering for district cooling

NC-v4 EAc3:Advanced energy metering
posted by  Camilo Velez  on 

Hi all,

We have encountered a peculiar situation in our project due to a couple of factors:

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Apr 19, 2023, 4:05 pm

No smoking signage without words

NC-v4 EQp2:Environmental tobacco smoke control
posted by  Heather Belsey  on 

I'm working on a healthcare project where the client is planning on using just the no smoking symbol on the door with no words or 'language' attached.  Just the cigarette crossed out - Is this

2
Managing Partner
Ecoimpact Consulting
LEEDuser Expert
171 thumbs up
Mon Apr 17, 2023, 6:30 pm

HPD Disclosure Threshold

NC-v4.1 MRc4:Material Ingredients
posted by  Gretchen Krumm  on 

LEED manual clearly says that an HPD must report ingredients at or above 0.1% for compliance with Option 1.

4
Default Avatar
LEEDuser Premium Member
1 thumbs up
Sun Apr 16, 2023, 10:20 am
2
Thu Apr 13, 2023, 9:16 pm

Can you use nearby census tracts?

NC-v4.1 LTc3:High Priority Site and Equitable Development
posted by  Jackson Ludwig  on 

Working on a confidential project that is commercial/industrial, and the site has its own census tract.  There are nearby tracts to the North, East, and South of the site.  The North and

1
Thu Apr 13, 2023, 7:50 pm

Monitoring and Corrective action plan

Pilot-Credits SSpc55:Bird collision deterrence
posted by  Luis Huertas  on 

I am working on developing the required monitoring plan, but in conversations with the American Bird Conservation manager, drafting a plan for a new building cannot be drafted in the way the requir

4
Fri Apr 7, 2023, 4:40 pm

Total Materials Cost vs Total Value of Sustainable Materials Cost

NC-v4.1 MRc3:Sourcing of Raw Materials
posted by  Chloe Naese  on 

Hi everyone, I was wondering what the difference is between the "Total Materials Cost" and "Total Value of Sustainable Materials Costs (unweighted)" in the BPDO calculator?

3
Associate
Kath Williams + Associates
LEEDuser Basic Member
4 thumbs up
Fri Apr 7, 2023, 4:03 am

Metering of chilled water

NC-v4 WEc4:Water metering
posted by  Nadia Azzam  on 

Our project comprises of two buildings- building 1 is existing, building 2 is new. We are only seeking LEED certification for building 2.

0

Wooded Area as open space?

NC-v4.1 SSc3:Open Space
posted by  Nadia Azzam  on 

Would a wooded area with lots of trees count as open space for this credit? Our project is surrounded by wooded areas that are basically greenfield areas with trees.