Forum quick links
Option B for a reception area in a massive office tower lobby
NC-2009 IEQc8.1:Daylight and views - daylightposted by Elliot Young on
So, back again to ask another one. We are ever so close to reaching 75% threshold and without having the engineers run daylight models or measure the space I'm trying to pick up any space we can.
Light in open 3 story mezzanines
NC-2009 IEQc8.1:Daylight and views - daylightposted by Elliot Young on
We just received our design credit responses and used method 2 - Prescriptive. We have a 3 story cafeteria space within a 30 story office building.
School as a Teaching Tool and Green Education
NC-2009 IDc1:Innovation in designposted by emily reese moody on
I am posting my question here, since it appears the v2.2 ID forum is closed for new comments. I have a v2.2 LEED-NC Campus project working on the final construction submission.
Existing Building Baseline WWR
NC-2009 EAc1:Optimize energy performanceposted by Christian Kaltreider on
Referencing 90.1 Table G3.1.5: I understand that the envelope for an existing building baseline model should reflect existing conditions concerning thermal properties of walls and windows.
Outside Mat
NC-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by Waterset CDD on
Hello, We have an outside mat that needs to be replaced. It was actually glued down during instillation. I would like to know the following: 1.
Waste Oil Fuel
NC-2009 EAp2:Minimum energy performanceposted by Michael Daly on
I am working on a project that has two parts to the building. There is an office component and a shop component. The office is going to be heated and cooled with a VRF system.
SSc4.3 Low-Emitting and Fuel-Efficient Vehicles Parking
NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Shad Traylor on
SSc4.3 credit: Low-Emitting and Fuel-Efficient Vehicles, The project is located on a large campus, do the preferred FE/LE parking spaces need to be located within the LEED project boundary? And if
Open Space Accessibility
NC-2009 SSc5.2:Site development - maximize open spaceposted by Ilana Judah on
We have a Residential project in New York City (complies with credit SS 2), and the ground level is a small amount of retail and a community space.
Minimum Benefit to Achieve ID Credits
posted by Aaron Smith on
Hello, It seems to me I read at some point in time that the CaGBC wanted to see a minimum measurable benefit for Innovative Strategies.
Fire Extinguisher & Cabinet (MRc4 & MRc5)
NC-2009 MRc4:Recycled contentposted by Elliot Young on
Hi, we just received a submittal for fire extinguishers and recessed fire extinguisher cabinets - claiming to have recycled content and regional materials.