Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Option B for a reception area in a massive office tower lobby

NC-2009 IEQc8.1:Daylight and views - daylight
posted by  Elliot Young  on 

So, back again to ask another one. We are ever so close to reaching 75% threshold and without having the engineers run daylight models or measure the space I'm trying to pick up any space we can.

3
Default Avatar
Designer
Rinkachung Architecture
LEEDuser Basic Member
1 thumbs up
Wed Feb 24, 2016, 1:40 pm

Light in open 3 story mezzanines

NC-2009 IEQc8.1:Daylight and views - daylight
posted by  Elliot Young  on 

We just received our design credit responses and used method 2 - Prescriptive. We have a 3 story cafeteria space within a 30 story office building.

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Fri Feb 19, 2016, 10:37 pm

School as a Teaching Tool and Green Education

NC-2009 IDc1:Innovation in design
posted by  emily reese moody  on 

I am posting my question here, since it appears the v2.2 ID forum is closed for new comments. I have a v2.2 LEED-NC Campus project working on the final construction submission.

2
Founder & Community Director
Metricorps
LEEDuser Expert
7781 thumbs up
Thu Feb 18, 2016, 7:50 pm

Existing Building Baseline WWR

NC-2009 EAc1:Optimize energy performance
posted by  Christian Kaltreider  on 

Referencing 90.1 Table G3.1.5: I understand that the envelope for an existing building baseline model should reflect existing conditions concerning thermal properties of walls and windows.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Tue Feb 16, 2016, 5:58 pm

Outside Mat

NC-2009 IEQc4.3:Low-emitting materials - flooring systems
posted by  Waterset CDD  on 

Hello, We have an outside mat that needs to be replaced. It was actually glued down during instillation. I would like to know the following: 1.

2
Founder & Community Director
Metricorps
LEEDuser Expert
7781 thumbs up
Fri Feb 12, 2016, 5:31 pm

Waste Oil Fuel

NC-2009 EAp2:Minimum energy performance
posted by  Michael Daly  on 

I am working on a project that has two parts to the building. There is an office component and a shop component. The office is going to be heated and cooled with a VRF system.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Thu Feb 11, 2016, 9:49 pm

SSc4.3 Low-Emitting and Fuel-Efficient Vehicles Parking

NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehicles
posted by  Shad Traylor  on 

SSc4.3 credit: Low-Emitting and Fuel-Efficient Vehicles, The project is located on a large campus, do the preferred FE/LE parking spaces need to be located within the LEED project boundary? And if

2
President
HJKessler Associates
LEEDuser Basic Member
41 thumbs up
Thu Feb 11, 2016, 12:47 am

Open Space Accessibility

NC-2009 SSc5.2:Site development - maximize open space
posted by  Ilana Judah  on 

We have a Residential project in New York City (complies with credit SS 2), and the ground level is a small amount of retail and a community space.

3
Wed Feb 10, 2016, 3:25 pm

Minimum Benefit to Achieve ID Credits

LEED Canada Forum
posted by  Aaron Smith  on 

Hello, It seems to me I read at some point in time that the CaGBC wanted to see a minimum measurable benefit for Innovative Strategies.

2
Default Avatar
President
Solterre Inc.
LEEDuser Premium Member
47 thumbs up
Mon Feb 8, 2016, 9:18 pm

Fire Extinguisher & Cabinet (MRc4 & MRc5)

NC-2009 MRc4:Recycled content
posted by  Elliot Young  on 

Hi, we just received a submittal for fire extinguishers and recessed fire extinguisher cabinets - claiming to have recycled content and regional materials.

2
Associate
NK Architects
LEEDuser Basic Member
11 thumbs up
Fri Feb 5, 2016, 1:47 am