Purpose behind the 60% RH parameter?

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Landry Watson  on 

The reference guide is clear that 14,000 CFM of OA per SF (that is >60deg and

5
Assistant Vice President - Sustainability
Alexandria Real Estate Equities
LEEDuser Premium Member
26 thumbs up
Wed May 4, 2016, 11:56 pm

Path 2 Flushout

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Amy Harmon  on 

Our project went with Path 2 Post-occupancy flush out. All AHUs required 2-4 days of flush out before occupancy could occur and about 24 days post occupancy.

10
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed May 4, 2016, 10:08 pm

Data Center Modeling - LEED CS version 2009

CS-2009 EAp2:Minimum Energy Performance
posted by  Anurag Joshi  on 

Dear fellow modelers, I have a query regarding modeling and saving percentage calculation for datacenter buildings for LEED CS -2009.

3
Wed May 4, 2016, 4:24 pm

Alternate Transportation: SSc4.3 and SSc4.4

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Greg Snow  on 

Hi Everyone, I am filling out the LEED letter template for SSc4.3 and SSc4.4 and don't know which path/option I should check.

5
Tue May 3, 2016, 5:32 pm

EAc3 - Enhanced Commissioning, LEED v2009

NC-2009 EAc3:Enhanced Commissioning
posted by  Jared Reed  on 

Our project is pursuing EAc3 - Enhanced Commissioning. The reference manual states that the CxA performing the enhanced commissioning must also perform the fundamental commissioning.

7
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon May 2, 2016, 3:37 pm

Timeline to File an Appeal

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Jason Moody  on 

Our project was denied credit due to a failed pre-requisite during the final review. The client once us to file an appeal to address the pre-requisite.

2
NH Green Consulting
LEEDuser Premium Member
80 thumbs up
Sun May 1, 2016, 10:06 pm

Exemplary Performance?

CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  José Solis  on 

The BD+C Reference manual states: "This credit is not eligible for exemplary performance under the Innovation in Design section." However, a response from Tristan Roberts on June 4, 2010 states th

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Apr 25, 2016, 6:47 pm

Room Input Report

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  Bill Friedl  on 

I had a comment on a LEED review in IEQc7.1 to provide a summary table which lists the heating and cooling design parameters used for each space type and the Room Input Reports for each space type.

2
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Mon Apr 25, 2016, 6:12 pm

Option 1 Path 2 Temperature and Humidty Requirements

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Amy Harmon  on 

Path 1 indicates flush-out needs to be accomplished with 14,000 cu ft. of OA per sq. ft. of floor area while maintaining an internal temperature of at least 60 deg F and no more than 60% RH.

3
Default Avatar
Scheeser Buckley Mayfield
LEEDuser Basic Member
0 thumbs up
Fri Apr 22, 2016, 2:07 pm

3 LEED projects sitting on a parking & retail layer cake

NC-2009 MRc4:Recycled Content
posted by  Susan Di Giulio  on 

Hi, We have a campus master site occupying a city block. There are 7 podium floors with a hotel, condo towers and retail sprouting from them that are parsed into 3 separate LEED projects.

6
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Thu Apr 21, 2016, 5:50 pm