Forum quick links
Solar Water Heating System
NC-2009 EAc2:On-Site Renewable Energyposted by Kalyan Nishtala on
Hi, Has anyone found a reliable calculator for estimating savings from a solar water heating system that has been submitted and accepted by USGBC reviewers.
Natural Ventilation in Apartment Buildings
NC-2009 IEQp1:Minimum IAQ Performanceposted by Sunayana Jain on
I have naturally ventilated apartment units. Apartment's inner most wall distance from the exterior window is 33’. Interior most side of the apartment has toilet and kitchenette.
Cold Climate
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Erin Holdenried on
Does anybody have experience using an alternate compliance path for a project in a cold climate?
How to implement WELL in a partially occupied building...?
posted by Brian Salazar on
Hello! First, thank you Tristan for adding a WELL discussion to this site. I'm sure it will be a great resource for a whole host of "do gooders" like myself.
Athletic Field Definition
NC-v4 WEc1:Outdoor water use reductionposted by Michelle DiPenti on
Our project has an outdoor area, as a part of the sports medicine department, which patients will use to do sprints, drills, and other exercises.
Initial fit-out vs alteration
CI-2009 PIf2:Project Summary Detailsposted by Kate Bubriski on
I have a project that is a tenant fit-out in an existing building.
Project Boundary
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Sharon Dearstyne on
We have a 11 story Historical hotel with 6 floors of Guest Rooms that are being completely renovated. The remaining floors are Ballrooms, meeting spaces and retail.
SLLc6 in v2009 vs v4 - no slopes do/don't qualify?
ND-v4 SLLc6:Steep slope protectionposted by GBD Architects on
Hi, the language in v4 is a little different from the v2009. v2009 explicitly says that sites without slopes can automatically qualify for the point. Does v4 remove that option?
promise for future showers?
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Kristen Magnuson on
The project in question is an existing single story C&S being renovated.
Central Plant - Condenser Loop
CS-2009 EAc1:Optimize Energy Performanceposted by MKK LEED on
We are working on a project with two buildings on one site, one commercial C&S, one Hotel.