Solar Water Heating System

NC-2009 EAc2:On-Site Renewable Energy
posted by  Kalyan Nishtala  on 

Hi, Has anyone found a reliable calculator for estimating savings from a solar water heating system that has been submitted and accepted by USGBC reviewers.

4
Head of Energy & Environmental Management
EB Project Management | Green Building Consultants
LEEDuser Basic Member
14 thumbs up
Fri Jun 17, 2016, 1:06 pm

Natural Ventilation in Apartment Buildings

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Sunayana Jain  on 

I have naturally ventilated apartment units. Apartment's inner most wall distance from the exterior window is 33’. Interior most side of the apartment has toilet and kitchenette.

6
Default Avatar
Sustainable Solutions
LEEDuser Basic Member
0 thumbs up
Thu Jun 16, 2016, 1:02 pm

Cold Climate

NC-2009 SSc7.2:Heat Island Effect—Roof
posted by  Erin Holdenried  on 

Does anybody have experience using an alternate compliance path for a project in a cold climate?

5
Default Avatar
Sustainability Specialist
PDC Inc. Engineers
LEEDuser Basic Member
0 thumbs up
Mon Jun 6, 2016, 10:24 am

How to implement WELL in a partially occupied building...?

WELL v1 Building Standard Tip Sheet
posted by  Brian Salazar  on 

Hello! First, thank you Tristan for adding a WELL discussion to this site. I'm sure it will be a great resource for a whole host of "do gooders" like myself.

4
Assistant Project Manager, LEED AP BD+C, WELL AP, CPHC
The Green Engineer, Inc.
LEEDuser Basic Member
7 thumbs up
Thu Jun 2, 2016, 2:58 pm

Athletic Field Definition

NC-v4 WEc1:Outdoor water use reduction
posted by  Michelle DiPenti  on 

Our project has an outdoor area, as a part of the sports medicine department, which patients will use to do sprints, drills, and other exercises.

3
SW Regional Design Resilience Leader
Gensler
LEEDuser Basic Member
15 thumbs up
Thu Jun 2, 2016, 1:50 pm

Initial fit-out vs alteration

CI-2009 PIf2:Project Summary Details
posted by  Kate Bubriski  on 

I have a project that is a tenant fit-out in an existing building.

6
Wed Jul 9, 2025, 6:47 pm

Project Boundary

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Sharon Dearstyne  on 

We have a 11 story Historical hotel with 6 floors of Guest Rooms that are being completely renovated. The remaining floors are Ballrooms, meeting spaces and retail.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu May 26, 2016, 6:30 pm

SLLc6 in v2009 vs v4 - no slopes do/don't qualify?

ND-v4 SLLc6:Steep slope protection
posted by  GBD Architects  on 

Hi, the language in v4 is a little different from the v2009. v2009 explicitly says that sites without slopes can automatically qualify for the point. Does v4 remove that option?

2
LEED AP-ND, Principal
Criterion Planners
LEEDuser Expert
231 thumbs up
Thu May 26, 2016, 3:31 pm

promise for future showers?

CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Kristen Magnuson  on 

The project in question is an existing single story C&S being renovated.

2
Senior Principal | Director of Sustainability Integration
SmithGroup
LEEDuser Expert
43 thumbs up
Wed May 25, 2016, 7:36 pm

Central Plant - Condenser Loop

CS-2009 EAc1:Optimize Energy Performance
posted by  MKK LEED  on 

We are working on a project with two buildings on one site, one commercial C&S, one Hotel.

5
Default Avatar
MKK Consulting Engineers
LEEDuser Basic Member
1 thumbs up
Tue May 24, 2016, 6:16 pm