Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Radon Requirements for LEED v4 - Residential/Dwelling Units

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Chris Wilson  on 

We are working on a five-story student dormitory including a partial basement area in EPA Radon Zone 1.  Are we required to follow the guidance for 'residential only' projects in high-risk are

1
Sat Jan 24, 2026, 7:12 am

Commuter/Light rail station further than 0.5 miles from project boundary

CI-v4 LTc3:Access to quality transit
posted by  Aarohi Savani  on 

I'm working on a access to quality transit(table 2) that has a commuter rail station at 1.6 miles walking distance from the project boundary.

0

Student Dormitory: Institutional or Residential?

NC-v4 LTc6:Bicycle facilities
posted by  Dan Jaconetti  on 

Can a student dormitory be considered Institutional (Case 1) or does it need to be calculated as Residential (Case 2).  Some people are saying that its housing so it must be residential howeve

3
Founder & Community Director
Metricorps
LEEDuser Expert
7782 thumbs up
Tue Jan 20, 2026, 6:19 pm

ASHRAE 62.1 filter requirement "minimum volumetric ozone removal efficiency of 40% filter"

NC-v4 EQp1:Minimum indoor air quality performance
posted by  John Covello  on 

I am researching HVAC filter manufacturers and none so far seem to be able to provide me documentation for a carbon filter that meet the minimum volumetric ozone removal efficiency of 40%.

0

Stormwater Treatment Offsite by Municipality

NC-v4 WEp1:Outdoor water use reduction
posted by  Maya Facciolo  on 

Our project is located within the Fresno Metropolitan Flood Control District (FMFCD) in California, which provides regional stormwater treatment and discourages on-site water quality treatment.

0

Pilot Credit INpc155

Pilot-Credits INpc155:Design for Indoor Air Quality and Infection Control
posted by  Roxanne Button  on 

Has anyone attempted this Pilot Credit yet?  Our project is a college science building which was under construction during the COVID-19 shutdown, and already incoporates most of the requiremen

16
Wed Jan 14, 2026, 7:21 am

Project with mix of New Construction and Alterations

LEED Guidance for Campuses and Multiple Buildings
posted by  Kent B   on 

The project is an elementary school project with four buildings on the site.

1) Building A: main elementary building. Building is being fully replaced.

0

LEED v4.0 Energy Model: How to Handle Unknown (Central Plant) Equipment Data for Tenant Fit-Out?

CI-v4 EAc2:Optimize energy performance
posted by     on 

I’m working as an energy modeler on a 3‑floor office fit‑out within a 42‑story building in New York City (LEED v4.0).

1
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Wed Jan 7, 2026, 7:32 pm