Conformity of commingled facility process
NC-v4 MRc5:Construction and demolition waste managementposted by William Leblanc on
The commingled waste facility that process our project waste work as follows: They weight the container once it arrives from job site, then separate the diffents matrials into percentage of the loa
Galvanize Repair
NC-2009 IEQc4.2:Low-emitting materials - paints and coatingsposted by Sean Kirk on
Hello, My project contains interior galvanized steel which will need repairing during installation.
Garbage Truck Maintenance Garage
NC-v4 SSc5:Heat island reductionposted by Edgar Arevalo on
Even though the vehicles parked inside the garage are garbage trucks and not vehicles used by FTE employees, can I still consider those parking spaces for Option 2?
proposed model fan power
CS-2009 EAp2:Minimum energy performanceposted by jack evans on
We have received our Design Final Review comments and the LEED reviewer has denied EAp2 because the proposed equipment capacities do not match the equipment schedules on the HVAC drawings.
Company providing Shuttle to Train Station
NC-2009 IDc1:Innovation in designposted by Joyce Kelly on
A warehouse / distribution center facility just bought a shuttle to transport employees to / from train station (more than 2 miles away.) We understand this doesn't meet the intent of SSc4.1, but i
LI ID #10421 allows 90.1-2010 for v2009 but how to document it?
NC-2009 EAp2:Minimum energy performanceposted by RETIRED on
One of my projects is considering using LI ID #10421 (http://www.usgbc.org/content/10421) that allows v2009 projects to use ASHRAE 90.1-2010 with an adjusted point scale.
Do aerosol rust-inhibitor paints fall under LEED guidelines?
NC-v4 EQc2:Low-emitting materialsposted by Debra a. Lombard on
we have steel doors that will have a very nasty primer put on in the shop that has carbon black, formaldehyde, cobalt based chemical and other nasty stuff.
System Furniture Include or Excluude?
CI-2009 IEQc8.1:Daylight and views - daylightposted by Alain Brierley on
I am working on a large 12 story office building that has a 12 story toplite open atrium requiring the credit be documented using option 1.
Energy STAR appliances - what counts
CI-v4 EAc2:Optimize energy performanceposted by emily reese moody on
Under v3, only new appliances/equipment being purchased for the project counted and had to be tracked for credit compliance. Is that still the case here?
ENERGY STAR - only newly purchased eligible products?
CI-v4 EAp2:Minimum energy performanceposted by Joanna Switzer on
Not seeing this qualified in the Reference Guide, but hoping someone can verify this is still the same as in 2009 CI....the pre-req compliance (and elective credit points under Optimize Energy) is