Brownfield Documentation
NC-2009 SSc3:Brownfield Redevelopmentposted by Ivan Romero on
I've scanned the discussions on Brownfield and didn't see this addressed directly.
when we register a pilot credit....
Pilot-Credits EApc65:Monitoring based commissioningposted by Gail Napell on
we registered the pilot credit; is it supposed to show up in the project in LEEDonline? how do we upload the documentation???? thanks for guidance -
Transients for complex occupancy
NC-2009 PIf3:Occupant and Usage Dataposted by David Browne on
In trying to determine the peak transients and daily average transients for a building with several distinct user groups, my client has given me a schedule of when each group will use the building
non-irrigation credit
NC-v4 WEc2:Indoor water use reductionposted by henry nguyen on
Hello. If my project will have no water use for permanent irrigation sys after 2 yrs threshold and it has used of native plants, I wd instantly qualified for 2p, given this is a Rqmt and ALSO a cre
Roof Terrace Storm Drains
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Jeannie Rueter on
I'm working on a major remodel project next to the ocean.
Exterior Lighting Baseline vs Proposed
NC-2009 EAp2:Minimum Energy Performanceposted by Maria Unruh on
I'm trying to understand baseline exterior lighting versus the proposed. My calculations show that my proposed is less than my baseline, is this okay?
Education & Outreach ID credit for v4?
Hospitality-NC-v4 INc1:Innovationposted by Karen Heet on
Howdy! Does v4 accept the ID credit Education & Outreach as the 2009 version did? Many thanks!
Between LEED v4 BD+C:NC or LEED v4 ID+C: CI
posted by Edgar Arevalo on
This may be a silly question, but I ask in order for some clarification. I have a particular question using the 40/60 rule.
Editing Form Values
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Ryan Kurlbaum on
I have uploaded all the necessary documentation and made sure that the excel file "supplemental daylight and views" is properly filled out, however on the credit form the "total regularly occupied
Who can be the CxA?
CI-v4 EAc1:Enhanced commissioningposted by emily reese moody on
Under v3, if a project wanted to pursue the enhanced Cx credit, a third-party CxA was required, and that entity completed the activities for both the prerequisite and the enhanced credit. Have the