NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roof
posted by  David Browne  on 

With regard to Credit MRc1.1-Exisitng walls, floors and roof: I have a building which has a fake mansard around its perimeter.

1
Mon Jun 1, 2015, 9:13 pm

LEED project with associated Parking Deck

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Ashley Love  on 

I have a question concerning LEED projects with associated parking decks. If this question has been answered elsewhere, I have not been able to find it, so please point me in the direction!

1
Tue Jan 17, 2017, 6:12 pm

Double trouble with ceilings

Schools-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elements
posted by  Cynthia Kaplan  on 

Our school project is retaining nearly all of the original plaster ceilings. We are, however, removing the suspended ceilings that were installed in the 1970's, just below the plaster ceilings.

1
Wed Nov 25, 2015, 2:40 am

Sustainable Purchasing: Durable Goods

NC-2009 IDc1:Innovation in Design
posted by  Joyce Kelly  on 

Working on a Warehouse with (4) vending machines, (2) refrigerators. With 24 hr. loads, these seem like good candidates for requring Energy Star qualified products.

1
Wed Jan 18, 2017, 4:29 pm

No mention of Private offices

CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controls
posted by  Edgar Arevalo  on 

Can we still include private offices that have occupancy sensor controls. Under the drop down space type menu, it only mentions shared office.

1
Wed Feb 22, 2017, 4:06 pm

Low Emitting Materials Tracking Spreadsheet

Healthcare-v2009 IEQc4:Low-emitting materials
posted by  Patrick Thibaudeau  on 

Is there a tracking spreadsheet for low emitting materials like there is for recycled content and regional materials.

1
Thu May 19, 2016, 4:15 pm

RE: Would we exclude interior walls that were never permitted?

NC-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elements
posted by  Diane Hale CHMM, CDGP, CEM, CESCO  on 

We have an existing older building that had interior walls and sectioned rooms put in that were never permitted and were not code compliant.

1
Mon May 1, 2017, 4:00 pm

Stadium / Arena

NC-2009 IEQc7.2:Thermal Comfort—Verification
posted by  Stacey Olson  on 

I'm working on a stadium project. I reviewed the IEQ Space Matrix, and it appears to indicate all commercial spaces, inclusive of retail or assembly spaces, can comply with this credit.

1
Mon Mar 6, 2017, 4:13 pm

What is the baseline assumption for this credit?

CI-v4 IPc1:Integrative process
posted by  Betty Liu  on 

Hi All, We are designing a CI v4 office space in an existing high-rise building.

1