Lighting University Store transaction area and merchandise area
Schools-2009 IEQc6.1:Controllability of Systems—Lightingposted by Bruce Lee on
Was not able to find this information anywhere in the threads.
Building Reuse
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by David Browne on
With regard to Credit MRc1.1-Exisitng walls, floors and roof: I have a building which has a fake mansard around its perimeter.
LEED project with associated Parking Deck
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Ashley Love on
I have a question concerning LEED projects with associated parking decks. If this question has been answered elsewhere, I have not been able to find it, so please point me in the direction!
Double trouble with ceilings
Schools-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elementsposted by Cynthia Kaplan on
Our school project is retaining nearly all of the original plaster ceilings. We are, however, removing the suspended ceilings that were installed in the 1970's, just below the plaster ceilings.
Sustainable Purchasing: Durable Goods
NC-2009 IDc1:Innovation in Designposted by Joyce Kelly on
Working on a Warehouse with (4) vending machines, (2) refrigerators. With 24 hr. loads, these seem like good candidates for requring Energy Star qualified products.
No mention of Private offices
CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controlsposted by Edgar Arevalo on
Can we still include private offices that have occupancy sensor controls. Under the drop down space type menu, it only mentions shared office.
Low Emitting Materials Tracking Spreadsheet
Healthcare-v2009 IEQc4:Low-emitting materialsposted by Patrick Thibaudeau on
Is there a tracking spreadsheet for low emitting materials like there is for recycled content and regional materials.
RE: Would we exclude interior walls that were never permitted?
NC-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elementsposted by Diane Hale CHMM, CDGP, CEM, CESCO on
We have an existing older building that had interior walls and sectioned rooms put in that were never permitted and were not code compliant.
Stadium / Arena
NC-2009 IEQc7.2:Thermal Comfort—Verificationposted by Stacey Olson on
I'm working on a stadium project. I reviewed the IEQ Space Matrix, and it appears to indicate all commercial spaces, inclusive of retail or assembly spaces, can comply with this credit.
What is the baseline assumption for this credit?
CI-v4 IPc1:Integrative processposted by Betty Liu on
Hi All, We are designing a CI v4 office space in an existing high-rise building.