FAQs about EAp2 :

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

Can I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements?

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

View answers »

Forum discussion

CS-2009 EAp2:Minimum Energy Performance

Campus Site Lignting Calcs - again, sorry

We submitted (on Jan 23, 2014) the question below. Unfortunately, since then my email has crashed and I have lost the response. Is there any way this can be recovered? Much Thanks!! "We have a campus application for our 3 mixed-use buildings. We are now on our final review and need to modify our submittal. We submitted the site lighting calculations not taking advantage of the master site like we did on other credits. The engineer in charge submitted the site data as if 2 of the projects supplied all the electricity for the site lighting. In other words, that each of the two projects supplied roughly 50% each of the lighting power when actually they should be categorized as supplying roughly 33% each. He said that this was done because ASHRAE 90.1 template wants to show where the power feed comes from rather than sharing the provided energy related to the master site. The infrastructure for the lighting emanates from these two buildings as the third building (still within the boundary of the master site) is located more remotely and does not feed the lighting. Do you see any problem with changing the submittal to show that we divide the power more equitably for the three projects? We expect to write a detailed narrative explaining the changes. Thank you in advance for your help."

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Mon, 10/06/2014 - 17:27

If you scroll to the bottom of the page you will see multiple pages of this forum in date order. Your original post and my response are still there on page 2.