Reporting through Energy Star Portfolio Manager
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Claudia Galvis on
How often does the Owner need to report the Utility data if using the Energy Star Portfolio Manager to comply with MRP6? The form says on a 'regular basis', but does this mean monthly?
Using microgrid battery storage to achieve demand response credi
Pilot-Credits EApc8:Demand responseposted by S. Sachs on
I am working on a project that will be able to store 175 kWh in onsite battery storage (about 50% of its daily energy use).
Existing parking lot, new LEED space
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Susan Reid on
Our project is a build-out in an existing non-LEED building in a suburban office park - there is a shared parking lot for several buildings and we are not adding any NEW spaces.
Shower Requirement for Leasing & Ammenity space of a Res.Bldg
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Aaron McEwin on
With reference to LI #10209, I would appreciate clarification on the following: LI#10209:Applies only to mixed use building.What is defined as non-residential component per this interpretation? Wo
IN: Green Building Education
EBOM-v4 INc1:Innovationposted by Alexa Stone on
One of the elements of this credit includes: The development of a manual, guideline or case study to inform the design of other buildings based on the successes of this project.
Custom Walk-In Freezers and Refrigerators
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by David Hryvniak on
I am working on a project with commercial food service equipment. The equipment includes a few custom walk-in freezers and coolers.
Is a Rollout Mat considered a permanent entryway system?
EBOM-v4 EQc2:Enhanced indoor air quality strategiesposted by Tim Nabholz on
According to the language provided for the credit: "Acceptable entryway systems include permanently installed grates, grilles, slotted systems that allow for cleaning underneath, rollout mats, and
Pursuing credits in recert that were denied during intial cert
posted by Alexa Stone on
Hi LEED Experts, My question pertains specifically to two credits in the LEED v2009 EBOM rating system, SSc3 & EQ3.6. These two credits were denied during the original certification.
Integrated Project Team Members
Healthcare-v2009 IDp1:Integrated project planning and designposted by Kim Lombard on
Some of our team members have changed throughout the lengthy design and construction process of a Major Hospital.
Amphitheater Occupancy
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Peter Doo on
Our project is the back stage area of a seasonal outdoor amphitheater concert venue. The venue hosts concerts 35 days per year over a 24 week period.