Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

building-height-to-street-width ratio

Pilot-Credits PC14:Walkable Streets
posted by  Eric Carbonnier  on 

How does the building-height-to-street-width ratio promote walkable environments?

0

LEED Online Form Help for Process Water

Retail-CI-v2009 WEp1:Water use reduction
posted by  Sara Zoumbaris  on 

Hello, I have a project with three pieces of process water equipment and I have a few questions about the form. 1.

0

following v4 requirements?

NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roof
posted by  Erica Downs  on 

Any idea if the v4 version of this credit (MRc1 Building Life-cycle Impact Reduction) could be substituted here? Or maybe pursued for an innovation point?

1
Wed May 13, 2015, 5:25 pm

Views for Ballroom (Conference Center)

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  Qiongwen Kong  on 

We have a project that consists of a 17-story and a large conference center on lower levers.

1
Thu May 12, 2016, 7:23 pm

ASHRAE version for taller buildings

Mid-Rise-v4 EQp1:Ventilation
posted by  S. Sachs  on 

We are working on a multi-family residential building, which is 7 stories tall.

1
Tue Jan 22, 2019, 8:26 am

Classroom Building on a Commuter College Campus

Pilot-Credits PC14:Walkable Streets
posted by  Allen Schaffer  on 

Our 90,000 SF Humanities Building on a commuter college campus was just about the most perfect project for this pilot credit.

0

(HERS) index score of at least 75

ND-v2009 GIBc2:Building energy efficiency
posted by  mugahid khatib  on 

for a residential LEED ND project seeking LEED ND Plan certification only, the Homes that are required to achieve at least 75 HERS index. is providing a RESNET HERS model enough , or should the h

1
Sat Oct 1, 2016, 8:52 pm

Injected foam insulation with 0 g/L VOCs

Schools-2009 IEQc4.6:Low-Emitting Materials—Ceiling and Wall Systems
posted by  Erin Holdenried  on 

I have a project using Injected foam insulation with 0 g/L VOCs. Does this product meet the credit intent? Or must it meet the specific CDHS testing requirements?

1
Thu Dec 17, 2015, 1:17 am

Baseline ratios

CI-v4 LTc5:Reduced parking footprint
posted by  Susan Di Giulio  on 

Is there guidance anywhere as to how to interpret the Institute of Parking Engineers tables? There are many columns, but none say exactly "baseline ratio". Or what it is a ratio of.

1
Sun Aug 27, 2017, 10:24 pm

Manufacturing Location to Distance Jobsite

CI-2009 MRc5:Regional Materials
posted by  Hope Peg  on 

Hi Everyone!! I need help- please.. National Gypsum Sheathing is manufactured in Mount Holly North Carolina and my Project is located In Silver Spring , Maryland .

1
Tue May 23, 2017, 3:23 pm