Forum quick links
Requirements for Copy/Printer Rooms
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Sean Blaevoet on
Does LEED require the copy/printers to be in a separate room with doors?
Aggregate vs. lowest performing
posted by Lou Niles II on
I have seen a reply on the forums from Eric Anderson claiming that the LEED Guide to Campus and Group approach is incorrect in stating that the Lowest performing building will be counted in a numbe
Low Emitting Products
Homes-v4 EQc7:Low-emitting productsposted by Jess Harris on
Can somebody confirm that site applied paints, coatings, flooring, insulation, site applied adhesives and sealants need to meet the newer testing V1.1-2010, CA Section 01350.
Hotel Room Lighting Exceptional Calculation
NC-2009 EAp2:Minimum Energy Performanceposted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on
We would like to apply the exceptional calculation method for guest room lighting in a 165-unit hotel.
Envelope Categorization
CS-2009 MRc1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Russell Philstrom on
Hello All-- I have two associated questions: Part 1: I'm working on a project in which a previously open arcade is being enclosed and am wondering about how to calculate envelope area.
Exemplary Performance
Schools-2009 EAc6:Green Powerposted by Kevin Taterus on
LFS 2009 rating system - Our Owner on the project received a quote from a renewable energy provider that stated we could get three points total if we purchased 100% of the energy from renewable sou
Assesment rooms at rehabilitation Center
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Saju Varghese on
Hello everyone. I was wondering if triage assessment rooms need to be considered workstations since this is where patients are going to be evaluated before admission.
SSc2 - Can on-campus uses apply towards "basic services"?
NC-2009 SSc2:Development Density and Community Connectivityposted by Jordan Petersen on
We are currently attempting to achieve SSc2 Development Density + Connectivity on a University Campus for the construction of a number of student housing units.
New to LEED Submitals
posted by Joel Clonch on
I have a mill-work submittal that requests : LEED Submittals: 1. Product Data showing VOC content does not exceed 30 g/L for wood adhesives and 80 g/L for contact adhesives. 2.
Historic Bldg Renovation being done in phases, Bldg reuse calcs
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Debra a. Lombard on
I'm working on behalf of a GC on a complicated historic renovation and new construction project that's being done in several phases with separate contracts between Owner and GC.