Requirements for Copy/Printer Rooms

CS-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Sean Blaevoet  on 

Does LEED require the copy/printers to be in a separate room with doors?

1
Fri Oct 31, 2014, 3:45 pm

Aggregate vs. lowest performing

General forums
posted by  Lou Niles II  on 

I have seen a reply on the forums from Eric Anderson claiming that the LEED Guide to Campus and Group approach is incorrect in stating that the Lowest performing building will be counted in a numbe

1
Wed Oct 5, 2016, 4:00 pm

Low Emitting Products

Homes-v4 EQc7:Low-emitting products
posted by  Jess Harris  on 

Can somebody confirm that site applied paints, coatings, flooring, insulation, site applied adhesives and sealants need to meet the newer testing V1.1-2010, CA Section 01350.

1
Sat Aug 26, 2017, 2:40 pm

Hotel Room Lighting Exceptional Calculation

NC-2009 EAp2:Minimum Energy Performance
posted by  Jeff Ross-Bain, PE, LEED Fellow, WELL AP  on 

We would like to apply the exceptional calculation method for guest room lighting in a 165-unit hotel.

1
Fri Jun 3, 2016, 3:03 pm

Envelope Categorization

CS-2009 MRc1:Building Reuse—Maintain Existing Walls, Floors and Roof
posted by  Russell Philstrom  on 

Hello All-- I have two associated questions: Part 1: I'm working on a project in which a previously open arcade is being enclosed and am wondering about how to calculate envelope area.

0

Exemplary Performance

Schools-2009 EAc6:Green Power
posted by  Kevin Taterus  on 

LFS 2009 rating system - Our Owner on the project received a quote from a renewable energy provider that stated we could get three points total if we purchased 100% of the energy from renewable sou

1
Tue Jul 26, 2016, 6:26 pm

Assesment rooms at rehabilitation Center

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Saju Varghese  on 

Hello everyone. I was wondering if triage assessment rooms need to be considered workstations since this is where patients are going to be evaluated before admission.

1
Fri Nov 27, 2015, 9:29 pm

SSc2 - Can on-campus uses apply towards "basic services"?

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Jordan Petersen  on 

We are currently attempting to achieve SSc2 Development Density + Connectivity on a University Campus for the construction of a number of student housing units.

1
Wed Oct 26, 2016, 2:19 pm

New to LEED Submitals

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Joel Clonch  on 

I have a mill-work submittal that requests : LEED Submittals: 1. Product Data showing VOC content does not exceed 30 g/L for wood adhesives and 80 g/L for contact adhesives. 2.

1
Tue Jan 17, 2017, 2:31 pm

Historic Bldg Renovation being done in phases, Bldg reuse calcs

NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roof
posted by  Debra a. Lombard  on 

I'm working on behalf of a GC on a complicated historic renovation and new construction project that's being done in several phases with separate contracts between Owner and GC.

1
Mon Mar 28, 2016, 6:39 pm