Forum quick links
Low Emitting Products
Homes-v4 EQc7:Low-emitting productsposted by Jess Harris on
Can somebody confirm that site applied paints, coatings, flooring, insulation, site applied adhesives and sealants need to meet the newer testing V1.1-2010, CA Section 01350.
Hotel Room Lighting Exceptional Calculation
NC-2009 EAp2:Minimum energy performanceposted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on
We would like to apply the exceptional calculation method for guest room lighting in a 165-unit hotel.
Envelope Categorization
CS-2009 MRc1:Building reuse - maintain existing walls, floors and roofposted by Russell Philstrom on
Hello All-- I have two associated questions: Part 1: I'm working on a project in which a previously open arcade is being enclosed and am wondering about how to calculate envelope area.
Exemplary Performance
Schools-2009 EAc6:Green powerposted by Kevin Taterus on
LFS 2009 rating system - Our Owner on the project received a quote from a renewable energy provider that stated we could get three points total if we purchased 100% of the energy from renewable sou
Assesment rooms at rehabilitation Center
NC-2009 IEQc6.1:Controllability of systems - lightingposted by Saju Varghese on
Hello everyone. I was wondering if triage assessment rooms need to be considered workstations since this is where patients are going to be evaluated before admission.
SSc2 - Can on-campus uses apply towards "basic services"?
NC-2009 SSc2:Development density and community connectivityposted by Jordan Petersen on
We are currently attempting to achieve SSc2 Development Density + Connectivity on a University Campus for the construction of a number of student housing units.
New to LEED Submitals
posted by Joel Clonch on
I have a mill-work submittal that requests : LEED Submittals: 1. Product Data showing VOC content does not exceed 30 g/L for wood adhesives and 80 g/L for contact adhesives. 2.
Historic Bldg Renovation being done in phases, Bldg reuse calcs
NC-2009 MRc1.1:Building reuse - maintain existing walls, floors and roofposted by Debra a. Lombard on
I'm working on behalf of a GC on a complicated historic renovation and new construction project that's being done in several phases with separate contracts between Owner and GC.
WEc2: Time frame for functional reclaimed water systems
NC-2009 WEc2:Innovative wastewater technologiesposted by Brian Bartholomew on
Under the Bird's Eye View here for WEc2, there is a citation of LEED Interpretation #10012 made on 05/09/2011 which states "projects may only count future infrastructure such as reclaimed water sys
MRc5 Material Tracking/Documentation
CS-2009 MRc5:Regional materialsposted by Maggie Hogan Skaug on
RE: usgbc.org/leedonline, CS2009 MRc5 I do not see a form or calculator for material tracking or other forms/upload requirements for this credit documentation.