Credit compliance using AVR as an alternative metric
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Zane Lichtneger on
I see some formal programs use “average vehicle ridership” (AVR) as an alternate metric. We are active participants with the Go Smart/Go Perks/Triangle Transit/Share The Ride program.
Can we use the IEQc4.5 Furniture and Furnishings as an ID credit
NC-2009 IDc1:Innovation in Designposted by Carmen Vidal-Hallett on
Hello: Our team is completing the maximum amount of credits under the IEQc4 and we were wondering if the IEQc4.5 Furniture and Furnishings can be counted as an Innovation and Design credit.
CxA for Enhanced
CI-v4 EAc1:Enhanced commissioningposted by Tony Haschke on
The project is under 20,000 sq. ft and only a tenant finish in an existing building. Can the CxA be an employee of the design firm for the enhanced Cx?
CFD Model
Healthcare-v2009 IEQc5:Indoor chemical and pollutant source controlposted by ESD Engineer on
I'm currently working with a CFD modeler for the contaminants portion of this credit. We're having trouble finding the generation rates per square foot of active contaminant.
Task Lights in Scope
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Jonathan Weiss on
Our owner is trying to save money, and we're trying to reduce plug loads by discouraging task lighting except where needed.
Sculpture Lighting
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Kristopher Croghan on
Our client is looking at a sculpture for an LEED CI space. The sculpture is made from wire and LED lighting.
Phasing Multiple LEED Projects
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Sara Zoumbaris on
We are working on a development where the project site is composed of two adjacent parcels of land.
Hardscape covered by building.
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Robert Webber on
I'm working with a team on a hotel project, which is a highrise in a dense urban environment (100% of the site is covered by the building).
ITE for elementary school with half day students
Schools-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by April Brown on
In the ITE study calcs, does it make sense to only count the number of students in the building at one time.
Group Project - WEp1 & WEc3
Healthcare-v2009 WEp1:Water use reductionposted by Emily Hope on
In group projects, the WEp1 form requires data to be submitted separately for each project building.