Modeling low flow fume hoods in a Lab
NC-2009 EAp2:Minimum Energy Performanceposted by Joyce Kelly on
Owner wanted all fume hoods operating with 100cfm 24:7.
LEED for tenant build outs within LEED certified building
posted by Elliot Young on
Hello and thank you ahead of time for your input.
OA Monitoring for DOAS serving several HPs
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Logan Dorrell on
For Case 1, Type 2, where at least 20% of the system serves non-densely occupied zones, we have a situation where (1) dedicated outside air system (DOAS) serves several smaller heat pump (HP) zones
DES or NO DES?
NC-2009 EAp2:Minimum Energy Performanceposted by Aru Sau on
In this project, we have one office, two plants signed up for LEED Campus.
Can multiple teams of two in-house staff perform the audit?
EBOM-v4 EQc6:Green cleaning - custodial effectiveness assessmentposted by Marc Mondor on
Our building contains a few million square feet, and while the APPA audit may be time consuming for a building of this size, we believe that it is worthwhile to pursue as part of our EBO
Rainwater Management GI
NC-v4 SSc4:Rainwater managementposted by Jamé Wills on
Is Exfiltration Trench/French Drains a Green Infrastructure Method?
Direction of transit trips
ND-v2009 NPDc8:Transportation demand managementposted by MAUDE PINTAL on
Hi,
When I calculate the daily trips of bus lines, do I need to add the numbers of trips, for example east + west ? considering that each direction is at a different bus stop.
Secure Facilities
Schools-NC-v4 SSc8:Joint use of facilitiesposted by Lisa Logan on
Is it no longer a requirement to lock down parts of the building in order to meet this credit?
Running Exhaust Into Energy Recovery Wheel
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Neil Sen on
Are we allowed to run exhaust from areas like trash rooms into an energy recovery wheel and still achieve this credit?
Rainwater Management through BMP
NC-v4 SSc4:Rainwater managementposted by Jamé Wills on
I have an 8 acre site that is largely buildings and roadway, is it possible to achieve this credit with the use of French drain (exfiltration trenches)?