Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Overhead coiling doors

Schools-2009 IEQc8.2:Daylight and Views—Views
posted by  Danielle Dunn  on 

Can overhead coiling doors count in this credit? Also if you have windows on more than one plane in a room should you take a section at each plane or show those windows in "elevation"?

1
Wed Dec 13, 2017, 3:54 pm

Innovation Credits in v4

NC-v4 INc1:Innovation
posted by  Lissa Spitz  on 

Hi all, I see that several of the old faithful innovation credits are still available in v4, but when I search actual v4 certified projects, I can't find a single one shown on their scorecards.&nbs

5
Tue Dec 12, 2017, 11:28 pm

Small addition to existing building

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Edmée Knight  on 

Our project is a small addition (<10% of total building GSF) to an existing building.

1
Tue Dec 12, 2017, 10:19 pm

Recycled non-potable water measurement

NC-v4 WEc3:Cooling tower water use
posted by  Elizabeth (Zeba) Floyd  on 

Our intention is to reuse stormwater and condensate for at least 20% of the make-up water for the Cooling Tower.

1
Thu Jan 11, 2018, 8:21 pm

Fundamental Commissioning Timeline

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Todd Bundren  on 

I am working on a project where the Owner Project Requirements and Basis of Design were created at the appropriate times.

1
Fri Dec 15, 2017, 5:26 pm

Bi-polar ionization

CI-v4 EQc1:Enhanced indoor air quality strategies
posted by  Suchi Daniels  on 

Universities and Colleges in Florida have installed bi-polar ionization for multiple purposes.  First, improved energy efficiency, second improved indoor air quality, and third, reduced mainte

1
Wed Dec 13, 2017, 3:56 pm

Water Metering (prereq and credit)

Warehouses-NC-v4 WEc4:Water metering
posted by  Ryan McEvoy  on 

If a project installs one meter for the building (essentially collectively metering indoor plumbing fixtures and domestic hot water) and another meter for irrigation water, what are the ramificatio

1
Wed Dec 13, 2017, 4:06 pm

Constuction Waste plan for Option 2

CI-v4 MRp2:Construction and demolition waste management planning
posted by  Deborah Stadler  on 

If a contractor is opting for Option 2 under the Construction and Demolition Waste Management credit, (less that 2.5 lbs/sf) do they still need to plan for Option 1 indicating the 5 streams to obta

1
Thu Dec 7, 2017, 5:00 pm

MR4, MR5 Credit Default Percentage For Unavailable Information

NC-2009 MRc4:Recycled Content
posted by  Jack McCaskill  on 

The steel supplier for the structures contractor on our project has gone out of business and thus information regarding MR4 Recycled Content, and MR5 regional materials information is unavaila

1
Wed Dec 6, 2017, 2:21 pm