Forum discussion

NC-2009 EAc1:Optimize Energy Performance

Minimum 18% energy saving after April 2016 - Scoring

My project will likely reach 20% to 23% Energy Savings. Does this mean I can only score the points after I meet the minimum? In other words is a 20 percent reduction only one credit point? Or is it 5 credit points?

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Tue, 11/21/2017 - 17:21

It is still worth all the points you earn, not just those above the 18% minimum.

Thu, 12/28/2017 - 12:19

Hi, Whether the project can achieve this 18% energy saving considering renewable energy such as solar hot water, solar pv. or not? My project is located in United Arab Emirates

Thu, 12/28/2017 - 16:02

In LEED 2009 the minimum would include any renewables. In LEED v4 the minimum must be achieved without renewables.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.