Forum quick links
Historic Building Energy Performance with Regard to Insulation
NC-v4 EAp2:Minimum energy performanceposted by Sara Greenwood on
Hello,
Getting Started
NC-v4 MRc1:Building life-cycle impact reductionposted by Mike Workman on
Hi All, Our building we are working on is not existing and will be built new on the site. Do we still qualify for Mrc1 option 4?
Applying Facility Averages to Commingled Streams
NC-v4 MRc5:Construction and demolition waste managementposted by Ben Austin on
The following are the waste streams that are being collected on the project site:
- Wood
- Metal
Schools: Shop-applied primers
Schools-NC-v4 EQc2:Low emitting materialsposted by Philip Kabza on
Previous restrictions on content of shop-applied primers (such as on structural steel), that were put on hold in v3, appear to not have carried forward at all in v4. Am I correct?
When to perform the waste audit?
EBOM-2009 MRc6:Solid Waste Management—Waste Stream Auditposted by Summer Minchew on
LEEDuser guidance clearly states that the waste audit should be performed during the Performance period.
Long Term Care Facilities NC or HC?
posted by Leanne Conrad on
I'm currently trying to decide if a project that contains a wing dedicated as a long term care facility is an NC or HC project or a combination of both.
Electric Forklifts Innovation Credit??
CS-v4 INc1:Innovationposted by Cora Kenrick on
Hello Fellow LEED Users,
I'm looking for advice.
Manufacturer Backup documentation
NC-2009 MRc4:Recycled Contentposted by Benoit Leclair on
Hi everyone,
I am wondering where I could find the justification for the following:
glass paint & SCAQMD Rule #?
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Debra a. Lombard on
Hi, we are a GC on a LEED NCv2009 project & need to paint some interior glass. I'm trying to confirm the VOCs the paint/coating needs to comply with.
More Than One Commingled Waste Hauler on a Job - 2 Streams?
NC-v4 MRc5:Construction and demolition waste managementposted by Patty Lloyd on
Hi, if a project has a demolition subcontractor who hires a commingled waste hauler for some of the demolition debris, and then during the construction phase of the project the GC hires a commingle