Project location : Canada
Project type : factory
Hi,
Our project is a factory that produces roofing products, we target LEED v4 silver. The building consists of an office space, a manufacturing space and a storage space. The manufacturing process requires chilled water and we would like to know if this equipment might be considered in the scope of this credit. From my point of view, it doesn't. This equipment is not part of the scope of works supervised by the HVAC engineer and will be installed directly by our client (who manufactures roof products).
Any ideas ?
Thanks !
Regards
Ben Stanley
Senior Sustainability ManagerWSP - Built Ecology
LEEDuser Expert
250 thumbs up
June 20, 2018 - 7:02 pm
Any equipment with more than 0.5 pounds (225 grams) of refrigerant must be addressed by the credit regardless of whether the equipment is part of the HVAC system or serves other manufacturing processes.