Forum quick links
Biobased materials - Manufacturer declared conformance
CI-v4 MRc4:Building product disclosure and optimization - sourcing of raw materialsposted by Danna Richey on
We have a project on which we're using a large amount of wool, and we'd like to be able to take credit for biobased materials. Since we're unable to find any
Sensor Faucets
NC-v4 WEp2:Indoor water use reductionposted by Jennifer Rennick on
In prior versions of LEED, sensor faucets were given a credit for reducing hand washing duration from 15 seconds to 12 seconds.
End use with multiple fuels
Retail-CI-v4 EAc3:Advanced energy meteringposted by Jared Silliker on
I'm working on a grocery project. Cooking will be a significant energy load, exceeding 10%, and will be gas-dominant.
Green-e endorsed carbon offset equivalent
NC-v4 EAc7:Green power and carbon offsetsposted by Conny Waltemath on
Hello - new to the site.
Interior Lighting Controls - Daylighting Controls
CI-v4 EAc2:Optimize energy performanceposted by Michael Archer on
The credit states the following: Install daylight-responsive controls in all regularly occupied daylit spaces within 15 feet (4.5 meters) of windows and under skylights for at least 25% of
Demolition includes Mechanical and Electrical equipment
NC-v4 MRc5:Construction and demolition waste managementposted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on
Assume a building to be demolished has large HVAC equipment and electrical gear, etc., and is not being reused but discarded.
School as a Teaching Tool French Learning Lab??
Schools-NC-v4 INc1:Innovationposted by Leanne Conrad on
I am working with a Francophone school in Canada who wish to pursue the School as a Teaching Tool innovation credit.
Lighting control in prison cells
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Sananda Mukherjee on
There are 3 levels of lighting that the lighting can adjust to within the prison cells in a jail but the inmates will not have the capability to control their own lighting, the controls w
Assessment Influence on Design
NC-v4 SSc1:Site assessmentposted by Summer Minchew on
My question ties back to the FAQ response: "The credit requires that projects assess each feature, but it does not require that every assessment influence the project design." This credit was denie