Forum quick links
How to fill out the Credit form for IEQc1 for a 100% outdoor air system that does not require OA monitoring?
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Nishank Shah on
I have a 100% OA ERU that operates constantly on an occupancy schedule. There is no Outdoor airflow monitoring device on the unit and no CO2 sensors for the densely occupied spaces.
How to fill out the Credit form for IEQc5 for a 100% outdoor air system that does not require OA monitoring?
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Nishank Shah on
I have a 100% OA ERU that operates constantly on an occupancy schedule. There is no Outdoor airflow monitoring device on the unit and no CO2 sensors for the densely occupied spaces.
Averaging Thermostats - acceptable means for 50%?
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Mark Van on
I am working on a Healthcare building, and most of the spaces combine (3) rooms into a single temperature control zone, with the thermostat located in one of the rooms. Would adding (at least
General Emissions Evaluation for installation products
Schools-EBOM-v4 EQc1:Indoor air quality management programposted by Sara Axon on
For installation of millwork, our installer uses basic items: liquid nail, wood glue, silicone, spackle, etc.
Locker Rooms as Changing facilities
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Ryan Christensen on
As I fill out the SSc4.2 credit form, I am having trouble reconciling my project into the changing facility vs. shower categories. The project has two large locker rooms with 100+ lockers.
BPDO Calculator
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by Christina Nontanovan on
Hello,
Book stack areas as non-regularly occupied?
NC-v4 EQc7:Daylightposted by Kavita Karmarkar on
Hi all,
Dual Flush Flow Rate
NC-v4 WEp2:Indoor water use reductionposted by Leanne Conrad on
We have a product data sheet for a dual flush toilet that states 6L/3L with an effective flush volume of 4L.
SSp2 Environmental Site Assessment
Schools-NC-v4 SSp2:Environmental site assessmentposted by Karly Michalowski on
I have a LEEDv4 for Schools project but is focusing on the interior restoration of the building and not site. Is Phase I ESA required for just interior restoration of the building?