Does IT and AV equipment need to be installed prior to IAQ testing?
CI-v4 EQc4:Indoor air quality assessmentposted by Diana Smiciklas on
Does IT and AV equipment need to be installed prior to IAQ testing? We are moving offices and our IT team will be dismantling and reinstalling AV and IT equipment the weekend prior to our move.
Modeling a DOAS Serving Shell Space
CS-2009 EAp2:Minimum Energy Performanceposted by Cory Duggin on
We have a fully designed DOAS that provides ventilation to the core and shell spaces of the building. Since the DOAS is fully designed, can we have it provide the ventilation to the shell spa
Appendix G system type for addition
NC-2009 EAp2:Minimum Energy Performanceposted by Hilary Giffen on
I have an addition to a manufacturing plant. The addition has its own HVAC system so the LEED boundary encompasses just the addition.
No cooling tower in design but core and shell spaces modeled as neutral with cooling tower in energy model.
Pilot-Credits WEpc94:No Cooling Towerposted by Chris Yates on
A project I am working on meets all the requirements for the design (no cooling tower, no use of the latent heat of the evaporative cooling of water, no cooling from a Dist
Historic District in vicinity
NC-v4 LTc3:High priority siteposted by Timothy Hillhouse on
I am working on a project in a rural NC town which has a historic district in its downtown area. Our project is downtown however the historic boundary goes around our block essentially surrou
Rainwater treated in high performance rain gardens and runoff
NC-v4 SSc4:Rainwater managementposted by Nita Christopher on
Project team has selected Option 2 of Rainwater Management Credit. Site is 3.85 acres. Geotech report indicates underlying soils to be clays with little to no infiltration potential.
General Emissions Evaluation Fire Safing & Fire Blanket Ins.
NC-v4 EQc2:Low emitting materialsposted by Jerimiah Luckett on
Has anyone else come across the issue of finding a CDPH v1.1-2010 compliant Safing Insulation or SAFB Insulation? The contractor submitted the Owens Corning/Thermafiber SAFB and Safing and accord
IDc1.3 Green Housekeeping
Schools-2009 IDc1:Innovation in Designposted by Danielle Dunn on
We received comments back on this credit stating that the policy must follow the EBOM Policy Model. However, we are working with a new construction school. Does this still apply?
Toilet is required for Changing Room?
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Karl Heitman on
Hi. I am inquiring if toilet is required as part of Changing Room for 2009 NC. Can the Changing Room be just a shower and a small area to change? Thanks in advance for your f
ULEF documentation and LEED Online form
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Erica Downs on
How does one document use of a ULEF melamine in LEED Online? There is only a check box for "Product Contains No Added Urea-Formaldehyde".