One of the triggers of the upstream equipment Cx requirements for EAc1 is that the "project building's gross floor area is greater than 50,000 square feet." Does this 50,000 GSF trigger refer to the entire building or only the floor area in the scope of the LEED boundary. The project in question is a 7,500 GSF addition to a building larger than 50,000 sf.