Wet Applied Products Meeting Option 1- Volume Requirement?
NC-v4 EQc2:Low emitting materialsposted by Summer Gorder on
For Wet Applied Products that meet IEQ credit 2, option 1: do you still need to provide the volume of the product used on the project, or is that just for option 2, Budget Calculation?
Off-site still available?
NC-v4 SSc3:Open spaceposted by Abigail Chan on
In previous versions of LEED, it seems as if the open space credit allowed for project developers to improve/restore off-site areas to achieve this credit (with 2 square feet offsite = 1 square foo
Green Energy
posted by David Stern on
Which of the following is Clean Energy... Laser Power, Hydro, Nuclear, Burning Dung, Methane, Clean Coal, Geothermal and/ or National Gas? Thank You
TVOC and CO2 Testing Recommendations for Arc
posted by Ece Ersoz on
Hi,
TRACE 700 Performance Report - Optimal
NC-v4 EAp2:Minimum energy performanceposted by Mark Norris on
Good Afternoon,
Occupancy date for Core and Shell
CS-2009 IEQc3:Construction IAQ Management Plan—During Constructionposted by Edgar Arevalo on
Regarding the MERV-8 filter section of this credit, which is for a C&S project, no tenant occupancy dates have been established. Should I just wait til we get the first tenant occupancy d
Option 1 Noncompliant Lights are Being Phased Out
EBOM-v4 SSc4:Light pollution reductionposted by Justin Schwartz on
Good afternoon everyone,
Ventilation Requirement for High Rise Residential
NC-v4 EQp1:Minimum indoor air quality performanceposted by Jay Murray on
Question: Is it necesary to hard duct ventilation air into each bedroom within the apartment?
Interior Partitions Option 2: Strategy F without movable partitions?
NC-v4 EQc6:Interior lightingposted by Cindy Quinn on
Has anyone had success earning Interior Lighting Option 2: Strategy F with a project that doesn't have movable partitions? Our project was denied this strategy because we don't have movable p