Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Heat Island with Solar Panels

NC-v4.1 SSc5:Heat Island Reduction
posted by  Anna Pooler  on 

Hello,

I'm working on a project that has a solar array covering the majority of the roof. Can we exempt the panels from the roof calculations for Heat Island Reduction?

1
Fri Oct 25, 2024, 4:39 am

Testing Protocol and Training Requirements

Pilot-Credits INpc137:Cleaning and Disinfecting Your Space for Emerging Pathogens
posted by  Glen Boldt  on 

Cleanliness Protocols:  Wondering if there has been any pushback from Operators/Facility staff on these protocols and the training requirements?  

0

Design for Indoor Air Quality and Infection Control

Pilot-Credits EQpc124:Performance-based indoor air quality design and assessment
posted by  Rihab Joucht  on 

Hello everyone!

I'm pursuing this pilot credit for a LEED v4 NC warehouse building and office, located in Longueuil. Any tips to share ?

0

Utilize emergency generator for peak demand reduction

NC-v4.1 EAc4:Grid Harmonization
posted by  Brightworks Sustainability  on 

Hello,

The project includes fossile fuel based emergency generator. Can we utilize the energency generator to comply with GH credit intent?

1
Mon Oct 21, 2024, 5:52 pm

50% Post consumer content

LEED v5 O&M Existing Buildings 2nd Public Comment
posted by  Todd Dayton  on 

In Class A office most paper available is 30% post consumer content.

0
2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Oct 11, 2024, 3:16 pm
3
Technical Director
Centek Laboratories, LLC
LEEDuser Basic Member
13 thumbs up
Wed Oct 9, 2024, 2:32 pm

Would a fieldhouse structure be included within the LEED Boundary

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by     on 

Our project is a community centre that includes a field house structure on site. The fieldhouse is partially enclosed, with the other portion covered by a canopy.

0