Meters for every floor? One Tenant Building
CI-v4.1 EAc3:Advanced Energy Meteringposted by Susan Di Giulio on
In our CI Project, we have a single Tenant. Per this credit, is a meter required for every floor of this 8 floor building? We believe that is not required for this CI project.
Short and Long Term Together?
NC-v4 LTc6:Bicycle facilitiesposted by Summer Minchew on
Can short and long term spaces be located together as long as all other requirements are met?
Bipolar Ionization devices; documenting reduced outside air quantities
Schools-NC-v4 EQp1:Minimum indoor air quality performanceposted by on
I have a new school project which currently has ionization devices throughout the HVAC RTUs. These ionization devices reduce the required outside air.
IES thermal block and baseline model with system 6
NC-v4 EAc2:Optimize energy performanceposted by Ying Lindsey on
Dear all,
I need your professional opinion about a project that I am currently working on.
Partial Compliance Requirement for Insulation Category
NC-v4.1 EQc2:Low-Emitting Materialsposted by Marcia Weekes on
For the insulation category, the credit language indicates that "At least 75% of all insulation, meets the VOC emissions evaluation." However, there is no further information to indic
Process HVAC modeling approach
NC-v4 EAc2:Optimize energy performanceposted by Pooja Sannamani on
Hi, we are consisering options for our high process load building in meeting the minimum requirements of the energy credit.
WaterSense & Future Baseline
EBOM-v4 WEp1:Indoor water use reductionposted by Waleed AlGhamdi on
I have a project in a peculiar situation that is not addressed outright by the guidelines language and I can use some help in interpreting the rules.
Ventilation for the building as a whole or by space?
CS-v4 EQc1:Enhanced indoor air quality strategiesposted by Sara Greenwood on
Can you meet the enhanced ventilation performance criteria by providing >30% ventilation for the building as a whole, even if you do not meet this performance for all zones/spaces?
SSc5 Offsite Restoration Contract/Performance Period
EBOM-2009 SSc5:Site Development—Protect or Restore Open Habitatposted by Randi Davis on
The performance period for our project is only 90 days.
ASHRAE 2007 G 3.1.1 Exception B
NC-2009 EAp2:Minimum Energy Performanceposted by on
I am working on a retail project with three restaurant spaces. I got a comment below from the LEED reviewer.